Measuring urban traffic congestion on the effect of a newly developed commercial area at Taman Tas / Tan Woei Liang

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2017Description: xii, 92 p. : ill. (some col.), charts (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0000745(Local)
Subject(s): Dissertation note: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017 Abstract: Along with the development of a city, transportation issue is always been forgotten and not being taken seriously. The newly developed commercial area at Taman Tas, Kuantan had attracted new traffic trips to/from this area. Serious traffic congestion during peak hours can be seen when high number of trips generated from the newly developed commercial area are combine with the existing through traffic at Jalan Kuantan – Gambang. This study will analyse the level of congestion on a section of Jalan Kuantan-Gambang that stretch along existing and newly developed area at Taman Tas. In this research, the traffic situation is investigated by conducting the questionnaires survey followed by traffic operational analysis using Malaysia Highway Capacity Manual. Finally, the newly suggested level of service of this road section is forecasted using Aimsun TSS software. The result shows the newly developed area at Taman Tas had bring the Level of Service of that section of road to LOS F. By means of some adjustments made and forecasted using Aimsun, the Level of Service is able to be brought up to LOS E.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG FKASA .T366 2017 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000120929
Final Year Report Final Year Report UMPLIB GAMBANG CD 11009 | FKASA .T366 2017 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000120930

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017

Bibliography : p. 74-75

Along with the development of a city, transportation issue is always been forgotten and not being taken seriously. The newly developed commercial area at Taman Tas, Kuantan had attracted new traffic trips to/from this area. Serious traffic congestion during peak hours can be seen when high number of trips generated from the newly developed commercial area are combine with the existing through traffic at Jalan Kuantan – Gambang. This study will analyse the level of congestion on a section of Jalan Kuantan-Gambang that stretch along existing and newly developed area at Taman Tas. In this research, the traffic situation is investigated by conducting the questionnaires survey followed by traffic operational analysis using Malaysia Highway Capacity Manual. Finally, the newly suggested level of service of this road section is forecasted using Aimsun TSS software. The result shows the newly developed area at Taman Tas had bring the Level of Service of that section of road to LOS F. By means of some adjustments made and forecasted using Aimsun, the Level of Service is able to be brought up to LOS E.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us