A study of construction waste material management in Malaysia : a contractor point of view / Hilmi Hakim Bakri

By: Material type: TextTextPublisher: Kuantan, Pahang : UMP, 2018Description: x, 71 pages : illustrations (some color) ; 30 cm. + 1 CD ROMContent type:
  • text
Media type:
  • unmediated
  • computer
Carrier type:
  • volume
  • computer disc
ISBN:
  • THE0000469(Local)
Subject(s): Dissertation note: Project Paper (Bachelor Degree in Civil Engineering) -- Universiti Malaysia Pahang – 2018 Abstract: Malaysia nowadays is develop at steady pace, because of that increasing in development in Malaysia is predictable. Because of the rapid development in construction industry, construction waste becomes a major problem for contractor and environment. This can be proving with newspaper clippings issued by the newspaper 'The Star'. Therefore, this study is to highlight contractor‟s perception on various construction waste materials and major environment concerns cause by this construction waste. Besides that, it is also to identify the problem that may arise by the waste product and analyses a suitable method to solve the problem that occurs by the construction waste. This research will cover peninsular area of Malaysia. This research also will focus on the construction waste material management by the respondent of contractor that has been selected and registered to CIDB. The questionnaires were prepared and hand out to the person involved in construction project. Data gathering carried out by doing literature review, applying a questionnaire survey and making related interviews through contractor. Based on the literature review, several problem causes by waste materials have been identify. These factors were then ranked on their relative importance, based on data from a questionnaire survey distributed to a wide range of professions in the industry. Data that collected from this study is analysis using SPSS software and Microsoft excels to determine influential factors contributing to construction waste management in Malaysia. Based on the analysis conducted, objectives can be achieved through the study finds that transportation costs, and a place for insect breeding gets a high average index. However the way to overcome the problem of construction waste that gets the highest average index is to manage areas to locate construction waste. In conclusion, to all objectives have been achieved, the factors that cause increasing of the construction waste can be identified, as well as the solution to help the contractor will also be explained in this research.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG FKASA .H55 2018 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000122832
Final Year Report Final Year Report UMPLIB GAMBANG CD 11299 | FKASA .H55 2018 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000122833

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelor Degree in Civil Engineering) -- Universiti Malaysia Pahang – 2018

Includes bibliographical references

Malaysia nowadays is develop at steady pace, because of that increasing in development in Malaysia is predictable. Because of the rapid development in construction industry, construction waste becomes a major problem for contractor and environment. This can be proving with newspaper clippings issued by the newspaper 'The Star'. Therefore, this study is to highlight contractor‟s perception on various construction waste materials and major environment concerns cause by this construction waste. Besides that, it is also to identify the problem that may arise by the waste product and analyses a suitable method to solve the problem that occurs by the construction waste. This research will cover peninsular area of Malaysia. This research also will focus on the construction waste material management by the respondent of contractor that has been selected and registered to CIDB. The questionnaires were prepared and hand out to the person involved in construction project. Data gathering carried out by doing literature review, applying a questionnaire survey and making related interviews through contractor. Based on the literature review, several problem causes by waste materials have been identify. These factors were then ranked on their relative importance, based on data from a questionnaire survey distributed to a wide range of professions in the industry. Data that collected from this study is analysis using SPSS software and Microsoft excels to determine influential factors contributing to construction waste management in Malaysia. Based on the analysis conducted, objectives can be achieved through the study finds that transportation costs, and a place for insect breeding gets a high average index. However the way to overcome the problem of construction waste that gets the highest average index is to manage areas to locate construction waste. In conclusion, to all objectives have been achieved, the factors that cause increasing of the construction waste can be identified, as well as the solution to help the contractor will also be explained in this research.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us