Selection of method in construction industry by using AHP method / Nur Syafikah Nasrudin

By: Material type: TextTextPublisher: Kuantan, Pahang : UMP, 2018Copyright date: © 2018Description: xi, 84 pages : illustrations (some color) ; 30 cm. + 1 CD-ROMContent type:
  • text
Media type:
  • unmediated
  • computer
Carrier type:
  • volume
  • computer disc
ISBN:
  • THE0000709(Local)
Subject(s): Dissertation note: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2018 Abstract: Method in construction industry is very important in construction industry. The type of method used in construction may affect the quality of the project. The method that discuss in this research are traditional method, design and build and industrial building system. According to (Sutt. J., 2011), in the traditional procurement method, the client will enter into the contracts separately with architect and contractor. The architect will responsible for design work, while contractor will responsible for construction work. Hence, design and build is contractor accepts responsibility for some or all of the design and for industrial building system is construction system that is built using pre-fabricated components. The objectives of this study are to identify the criteria and suitability for selecting delivery method in construction by Analytical Hierarchy Process (AHP) method. Analytical Hierarchy Process (AHP) is to determine the weights of importance of the parameters. The data concluded, the contractor for Grade 7 is suitable to use industrial building system method and traditional method is suitable for the contractor Grade 1.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG FKASA .S933 2018 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000126971
Final Year Report Final Year Report UMPLIB GAMBANG CD 11904 | FKASA .S933 2018 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000126972

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2018

Includes bibliographical references

Method in construction industry is very important in construction industry. The type of method used in construction may affect the quality of the project. The method that discuss in this research are traditional method, design and build and industrial building system. According to (Sutt. J., 2011), in the traditional procurement method, the client will enter into the contracts separately with architect and contractor. The architect will responsible for design work, while contractor will responsible for construction work. Hence, design and build is contractor accepts responsibility for some or all of the design and for industrial building system is construction system that is built using pre-fabricated components. The objectives of this study are to identify the criteria and suitability for selecting delivery method in construction by Analytical Hierarchy Process (AHP) method. Analytical Hierarchy Process (AHP) is to determine the weights of importance of the parameters. The data concluded, the contractor for Grade 7 is suitable to use industrial building system method and traditional method is suitable for the contractor Grade 1.