Multidiscipline BIM modelling for architectural and structural for trainee accommodation building / Farrah Syahida Mohd Fadzir
Material type:
TextPublication details: Kuantan, Pahang : UMP, 2017Description: ix, 43 p. : ill. (some col.), charts (some col.) ; 30 cm. + 1 CD-ROMISBN: - THE0007841(Local)
| Item type | Current library | Collection | Call number | Copy number | Status | Date due | Barcode | |
|---|---|---|---|---|---|---|---|---|
Thesis
|
UMPLIB GAMBANG | Reference | FKASA .F377 2017 r Bc. (Browse shelf(Opens below)) | 1 | Not for loan | 0000120898 | ||
Thesis
|
UMPLIB GAMBANG | Reference | CD 10995 | FKASA .F377 2017 r Bc. (Browse shelf(Opens below)) | 1 | Not for loan | 0000120899 |
Faculty of Civil Engineering and Earth Resources
Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017
Bibliography : p. 42-43
The modern Architectural, Engineering and Construction (AEC) industry is characterized by its fragmented, complex and multidisciplinary nature. Hence, the project success is heavily pivoted on its effective collaboration among the stakeholders during various project phases. On traditional 2D CAD projects, the information flow between the players and project stages is jumbled. However, on BIM based projects, the interaction is more flexible and overlapped where information is aggregated and shared transparently between the different users (owners, architects, structural and MEP engineers, consultants, contractors, and subcontractors).The purpose of this paper is to understand how BIM can improve project information flow. This is accomplished by modeling interactions among participants across the conceptual and schematic design stages as opposed to the traditional process of having information silos with sub-optimal communication between various project players. In this respect, two process models are created for traditional and BIM information flow. After that, a comparison between the two models is carried out to assess the potential design process improvements resulting from the use of BIM. The research contributes towards highlighting where failure in communication occurs and the hurdles preventing stream-lined workflow.