Process flow for electrical as-built building information modelling (BIM) model : a case study of podium for office building / Mohamad Nazren Izzudin Mohd Zainudin

By: Material type: TextTextPublisher: Kuantan, Pahang : UMP, 2019Copyright date: © 2019Description: x, 63 pages : Illustrations (some color) ; 30 cm. + 1 CD-ROMContent type:
  • text
  • text
Media type:
  • unmediated
  • computer
Carrier type:
  • volume
  • computer disk
ISBN:
  • THE0008198(Local)
Subject(s): Dissertation note: Project Paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang – 2019 Abstract: Nowadays, the management of information throughout a building’s lifecycle is becoming increasingly important and building information modelling (BIM) is often to ensure the interoperability of data. In BIM, there is 5 major disciplines which are Architecture model, Structure model, Mechanical model, Electrical model and Plumbing model. For this research, the focusing is on data management and as built drawings for Electrical model. Basically, data management is important to present the information of the components existing in the building. It will expose to parties some related information that easily to be reviewed. By utilizing BIM, the correct information after post construction can be reviewed more efficient as parties are using the same software which is Autodesk Revit. Conventional method normally the parties only involved in 2D drawings, a lot of spread sheets regarding to the information of components in the building, but we transform to 3D with details information inserted that the parties easily to review. By using BIM model approach, researcher believe that it will help the construction industries and minimize miscommunication among parties in coming years.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode
Thesis Thesis UMPLIB GAMBANG Reference Reference FKASA .M64 2019 r Bc. (Browse shelf(Opens below)) Not for loan T000000227
Thesis Thesis UMPLIB GAMBANG Reference CD12284 (Browse shelf(Opens below)) Not for loan T000000228

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang – 2019

Includes bibliographical references

Nowadays, the management of information throughout a building’s lifecycle is becoming increasingly important and building information modelling (BIM) is often to ensure the interoperability of data. In BIM, there is 5 major disciplines which are Architecture model, Structure model, Mechanical model, Electrical model and Plumbing model. For this research, the focusing is on data management and as built drawings for Electrical model. Basically, data management is important to present the information of the components existing in the building. It will expose to parties some related information that easily to be reviewed. By utilizing BIM, the correct information after post construction can be reviewed more efficient as parties are using the same software which is Autodesk Revit. Conventional method normally the parties only involved in 2D drawings, a lot of spread sheets regarding to the information of components in the building, but we transform to 3D with details information inserted that the parties easily to review. By using BIM model approach, researcher believe that it will help the construction industries and minimize miscommunication among parties in coming years.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us