Best practices to prevent out of sequence construction activities / Nurul Izati Shahidan

By: Material type: TextTextPublisher: Kuantan, Pahang : UMP, 2019Copyright date: © 2019Description: x, 38 pages : illustrations ; 30 cm. + 1 CD-ROMContent type:
  • text
  • text
Media type:
  • unmediated
  • computer
Carrier type:
  • volume
  • computer disc
ISBN:
  • THE0008636(Local)
Subject(s): Dissertation note: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019 Abstract: Delays in the construction industry are not something alienated anymore. The common problems and challenges in construction project are delay in implementation and operation. One of the causes of construction delays are out of sequence construction activities. Therefore, this study is conducted to identify the feasible practices to prevent out of sequence in construction projects. The research method that is being used in this study is individual interviews with industry practitioners from the construction industry. The findings of this study have shown that the most highlighted practices to prevent out of sequence construction activities lie upon the upper management and lower management that involves in the construction project itself.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG Reference Reference FKASA .I93 2019 r Bc. (Browse shelf(Opens below)) 1 Not for loan T000000570
Final Year Report Final Year Report UMPLIB GAMBANG CD12514 (Browse shelf(Opens below)) 1 Not for loan T000000571

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019

Includes bibliographical references

Delays in the construction industry are not something alienated anymore. The common problems and challenges in construction project are delay in implementation and operation. One of the causes of construction delays are out of sequence construction activities. Therefore, this study is conducted to identify the feasible practices to prevent out of sequence in construction projects. The research method that is being used in this study is individual interviews with industry practitioners from the construction industry. The findings of this study have shown that the most highlighted practices to prevent out of sequence construction activities lie upon the upper management and lower management that involves in the construction project itself.