Study of sand brick ratio 1:6 for partial replacement of sand with palm oil clinker (5%, 10%and 15%) / Nur Syahira Che Mohd Nawi

By: Material type: TextTextPublisher: Kuantan, Pahang : UMP, 2019Copyright date: © 2019Description: xiii, 70 pages : illustrations (some color) ; 30 cm. + 1 CD-ROMContent type:
  • text
  • text
Media type:
  • unmediated
  • computer
Carrier type:
  • volume
  • computer disc
ISBN:
  • THE0008736(Local)
Subject(s): Dissertation note: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019 Abstract: Nowadays, the construction industry and environmental management system has experienced a rapid development. Unfortunately, the rapid development of construction industry and environmental management has led to environmental pollution and the increased of waste generation from various sources. The oil palm industry is one of the major industries in Malaysia. According Malaysia Palm Oil Board (MPOB, 2015), palm oil industry in Malaysia produces about 90 million tons of palm oil in year 2014. A massive number of production will results to the massive number of waste produced. One of the waste produced in the oil palm industry is palm oil clinker (POC).This research is to study on the use of palm oil clinker (POC) as partial replacement for fine aggregate in cement sand brick. This study will benefits on reducing the use of natural sand. The effect of using different percentages of POC to LWSB due to compressive strength was investigated. There are three series of mix formulation of cement sand brick with mix density of 1600 kg/m3 were prepared that comprise of 5%, 10%, 15% as partial sand replacement from the total volume of sand was replaced with POC. The outcomes from replacing POC has resulting a good strength as in per requirement in JKR standard.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG Reference Reference FKASA .S245 2019 r Bc. (Browse shelf(Opens below)) 1 In Transit T000000761
Final Year Report Final Year Report UMPLIB GAMBANG Reference CD12608 (Browse shelf(Opens below)) 1 Not for loan T000000762

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019

Includes bibliographical references

Nowadays, the construction industry and environmental management system has experienced a rapid development. Unfortunately, the rapid development of construction industry and environmental management has led to environmental pollution and the increased of waste generation from various sources. The oil palm industry is one of the major industries in Malaysia. According Malaysia Palm Oil Board (MPOB, 2015), palm oil industry in Malaysia produces about 90 million tons of palm oil in year 2014. A massive number of production will results to the massive number of waste produced. One of the waste produced in the oil palm industry is palm oil clinker (POC).This research is to study on the use of palm oil clinker (POC) as partial replacement for fine aggregate in cement sand brick. This study will benefits on reducing the use of natural sand. The effect of using different percentages of POC to LWSB due to compressive strength was investigated. There are three series of mix formulation of cement sand brick with mix density of 1600 kg/m3 were prepared that comprise of 5%, 10%, 15% as partial sand replacement from the total volume of sand was replaced with POC. The outcomes from replacing POC has resulting a good strength as in per requirement in JKR standard.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us