<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>03677ntm a2200337 i 4500</leader>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">lcc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">1</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2024-06-04</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">FTKEE .D65 2024 r Thesis</subfield>
    <subfield code="p">T000003137</subfield>
    <subfield code="r">2024-06-04 00:00:00</subfield>
    <subfield code="w">2024-06-04</subfield>
    <subfield code="y">THESIS</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">lcc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">0</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2024-06-04</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">CD13539</subfield>
    <subfield code="p">T000003138</subfield>
    <subfield code="r">2024-06-04 00:00:00</subfield>
    <subfield code="w">2024-06-04</subfield>
    <subfield code="y">THESIS</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">100887</subfield>
    <subfield code="d">100893</subfield>
  </datafield>
  <controlfield tag="003">MY-KuUP</controlfield>
  <controlfield tag="005">20251125110902.0</controlfield>
  <controlfield tag="006">t||||fr|||| 000 0 </controlfield>
  <controlfield tag="007">ta</controlfield>
  <controlfield tag="008">240604t20242024my a|||fr|||| 00| 0 eng d</controlfield>
  <datafield tag="020" ind1=" " ind2=" ">
    <subfield code="a">THE0009870 (Local)</subfield>
    <subfield code="q">Hardback</subfield>
  </datafield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="a">UMPSA</subfield>
    <subfield code="b">eng</subfield>
    <subfield code="c">UMP</subfield>
    <subfield code="e">rda</subfield>
  </datafield>
  <datafield tag="090" ind1=" " ind2=" ">
    <subfield code="a">FTKEE .D65 2024 r Thesis</subfield>
  </datafield>
  <datafield tag="100" ind1="0" ind2=" ">
    <subfield code="a">Dokala Janandra Krishna Kishore,</subfield>
    <subfield code="e">author.</subfield>
  </datafield>
  <datafield tag="245" ind1="1" ind2="0">
    <subfield code="a">A new teaching learning artificial  bee colony based maximum power  point tracking approach for assessing various parameters of phoovoltaic system under different  atmospheric conditions /</subfield>
    <subfield code="c">Dokala Janandra Krishna Kishore</subfield>
  </datafield>
  <datafield tag="264" ind1=" " ind2=" ">
    <subfield code="a">Kuantan, Pahang :</subfield>
    <subfield code="b">UMPSA,</subfield>
    <subfield code="c">2024</subfield>
  </datafield>
  <datafield tag="264" ind1=" " ind2=" ">
    <subfield code="c">&#xA9; 2024</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">xiv, 148 pages ;</subfield>
    <subfield code="b">illustration ;</subfield>
    <subfield code="c">30 cm. +</subfield>
    <subfield code="e">1 CD-ROM</subfield>
  </datafield>
  <datafield tag="336" ind1=" " ind2=" ">
    <subfield code="2">rdacontent</subfield>
    <subfield code="a">text</subfield>
  </datafield>
  <datafield tag="337" ind1=" " ind2=" ">
    <subfield code="2">rdamedia</subfield>
    <subfield code="a">unmediated</subfield>
  </datafield>
  <datafield tag="338" ind1=" " ind2=" ">
    <subfield code="2">rdacarrier</subfield>
    <subfield code="a">volume</subfield>
  </datafield>
  <datafield tag="347" ind1=" " ind2=" ">
    <subfield code="2">rda</subfield>
    <subfield code="a">text file</subfield>
    <subfield code="b">PDF</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">Faculty of Electrical &amp; Electronics Engineering Technology</subfield>
  </datafield>
  <datafield tag="502" ind1=" " ind2=" ">
    <subfield code="a">Thesis (Doctor of Philosophy) -- Universiti Malaysia Pahang &#x2013; 2024</subfield>
  </datafield>
  <datafield tag="504" ind1=" " ind2=" ">
    <subfield code="a">Includes bibliographical references</subfield>
  </datafield>
  <datafield tag="520" ind1="3" ind2=" ">
    <subfield code="a">In recent years, the greatest obstacle in the universe has been environmental contamination and shortage of energy due to the rapid utilization of conventional fossil fuels.  It is evident that it has a serious impact on weather conditions, water resources, and  people's livelihood. Hence, many countries are trying to implement renewable/sustainable energy sources to preserve the environment. For the electrical industry,  renewable energy sources (RES&#x2018;s) perform a prominent role in fulfilling the energy  shortage and satisfying consumers without any blackouts. However, the difficult task  in the electrical system is to balance both power production and desired load demand  without any voltage, current and frequency changes. Another difficulty in the electrical  system with the integration of RES&#x2018;s is to minimize the entire cost, including initial  cost, operational cost, replacement cost, and maintenance cost. Besides, the performance of the Renewable Energy (RE)-based system has to be enriched with regard to  settling time, accuracy, speed, and efficiency. Hence, to optimize the cost of integrating RES&#x2018;s through newly developed maximum power point tracking (MPPT) based  optimization method such as grasshopper optimization algorithm (GOA) has been introduced. The cost of integration of PV/WT/Battery is $408540. In addition, the Levelized Cost of Energy (LCE) factor is 0.502 at 210 kWh/day. Besides enhancing the  RE-based performance in terms of settling time, accuracy, speed, and efficiency through hybrid gray wolf optimization with differential evolution (GWO-DE). As per  simulation outcome the GWO-DE extracts maximum peak power (MPP) of 674.6W in  0.06 sec with 99.88% efficiency. In addition, to enhance the performance teaching learning-based artificial bee colony (TLABC) method has been used at distinct weather conditions. In order to ascertain the effectiveness of the proposed methods, the proposed methods have been compared with other studied methods. As per the simulation  outcomes, the TLABC method shows a better response in terms of average tracking  time, convergence speed of 0.5175 sec, 9 iterations, and efficiency of 99.99% under  various atmospheric circumstances. Further, the proposed system has been developed  in the PV laboratory and validated with simulation results.</subfield>
  </datafield>
  <datafield tag="610" ind1="2" ind2="0">
    <subfield code="a">Faculty of Electrical &amp; Electronics Engineering Technology</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Universities and colleges</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Theses</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="2">lcc</subfield>
    <subfield code="c">THESIS</subfield>
  </datafield>
</record>
