TY - DATA TI - Rigging operations SN - MED0002424(Local) PY - 2007/// CY - Virginia Beach, VA PB - Coastal Technologies Corp. KW - Hoisting machinery KW - Rigging KW - Safety education, Industrial KW - Cranes, dericks, etc N1 - Menu options : play program, program outline, training points, resource material for DVD-Rom and language menu; Introduction -- Rigging plan -- Load characteristics -- Equipment requirements -- Environmental factors -- Inspection requirements -- Inspecting wire rope -- Inspecting synthetic webbing -- Inspecting hardware attachments -- Inspecting assembled rigging -- Life preparation -- Lifting the load -- Lift safety -- Sling care and use -- Wire rope maintenance and storage -- Synthetic webbing maintenance -- Conclusioin -- Session summary N2 - Examines the rigging plan, the steps necessary to rig a load and execute a lift. Addresses the correct way to handle rigging equipment when a lift has been completed. Highlights safety issues in accordance with OSHA regulations ER -