<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>05209ntm a2200337 i 4500</leader>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">lcc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">1</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2024-09-02</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">FTKPM .Y87 2024 r Thesis</subfield>
    <subfield code="p">T000003325</subfield>
    <subfield code="r">2024-09-02 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2024-09-02</subfield>
    <subfield code="y">THESIS</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">lcc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">-2</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2024-09-02</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">CD13667</subfield>
    <subfield code="p">T000003326</subfield>
    <subfield code="r">2024-09-02 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2024-09-02</subfield>
    <subfield code="y">THESIS</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">101216</subfield>
    <subfield code="d">101222</subfield>
  </datafield>
  <controlfield tag="003">MY-KuUP</controlfield>
  <controlfield tag="005">20251125110922.0</controlfield>
  <controlfield tag="006">t||||fr|||| 000 0 </controlfield>
  <controlfield tag="007">ta</controlfield>
  <controlfield tag="008">240902s20242024my a|||fr|||| 000 0 eng d</controlfield>
  <datafield tag="020" ind1=" " ind2=" ">
    <subfield code="a">THE0009941  (Local)</subfield>
    <subfield code="q">Hardback</subfield>
  </datafield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="a">UMPSA</subfield>
    <subfield code="b">eng</subfield>
    <subfield code="c">UMP</subfield>
    <subfield code="e">rda</subfield>
  </datafield>
  <datafield tag="090" ind1=" " ind2=" ">
    <subfield code="a">FTKPM .Y87 2024 r Thesis</subfield>
  </datafield>
  <datafield tag="100" ind1="0" ind2=" ">
    <subfield code="a">Mohd Yusrizal Bin Mohd Yusoof,</subfield>
    <subfield code="e">author.</subfield>
  </datafield>
  <datafield tag="245" ind1="4" ind2="0">
    <subfield code="a">The effect of quick response  manufacturing on supply chain  activities in the automotive  manufacturing environment /</subfield>
    <subfield code="c">Mohd Yusrizal Bin Mohd Yusoof</subfield>
  </datafield>
  <datafield tag="264" ind1=" " ind2="1">
    <subfield code="a">Kuantan, Pahang :</subfield>
    <subfield code="b">UMPSA,</subfield>
    <subfield code="c">2024</subfield>
  </datafield>
  <datafield tag="264" ind1=" " ind2="4">
    <subfield code="c">&#xA9; 2024</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">xiii, 95 pages :</subfield>
    <subfield code="b">illustration ;</subfield>
    <subfield code="3">0 cm. +30 cm. +</subfield>
    <subfield code="e">1 CD-ROM</subfield>
  </datafield>
  <datafield tag="336" ind1=" " ind2=" ">
    <subfield code="2">rdacontent</subfield>
    <subfield code="a">text</subfield>
  </datafield>
  <datafield tag="337" ind1=" " ind2=" ">
    <subfield code="2">rdamedia</subfield>
    <subfield code="a">unmediated</subfield>
  </datafield>
  <datafield tag="338" ind1=" " ind2=" ">
    <subfield code="2">rdacarrier</subfield>
    <subfield code="a">volume</subfield>
  </datafield>
  <datafield tag="347" ind1=" " ind2=" ">
    <subfield code="2">rda</subfield>
    <subfield code="a">text file</subfield>
    <subfield code="b">PDF</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">Faculty of Manufacturing and Mechatronic Engineering Technology</subfield>
  </datafield>
  <datafield tag="502" ind1=" " ind2=" ">
    <subfield code="a">Thesis (Master of Science) -- Universiti Malaysia Pahang &#x2013; 2024</subfield>
  </datafield>
  <datafield tag="504" ind1=" " ind2=" ">
    <subfield code="a">Includes bibliographical references</subfield>
  </datafield>
  <datafield tag="520" ind1="3" ind2=" ">
    <subfield code="a">Nowadays, manufacturing companies endure a tough time adapting to the world  economy, which reaches the customer&#x2019;s requirement in terms of delivery speed. The  automotive industry is one of the essential industries in Malaysia&#x2019;s manufacturing sector.  This study was conducted at the actual industry case study from automotive  manufacturers in Malaysia. Company X is a wholly owned subsidiary multinational  company in Pekan, Pahang, which focuses on the production of luxury cars. Note that the  efficient supply chain and assembly line process in the automotive industry is crucial for  streamlining production processes and optimising workflow in manufacturing  automotive. The challenges and inefficiency in the production assembly line system can  lead to delays and decreased productivity. These issues can result in increased operation  costs, longer lead times, and compromised customer satisfaction. The actual situation  challenges in the medium automotive manufacturing company is that the material  handling layout design did not cater to the production productivity. Hence, the ideal  situation of Quick Response Manufacturing (QRM) is an application or planning or an  effective strategy for the company to reduce external and internal lead time. The major  challenge facing this is to produce more products using little material, little energy, little involvement of labour, and low operation cost. This requires a comprehensive analysis  of the existing layout, considering factors such as the layout organisation, set-up time,  retrieval processes, and minimisation of part defects. Logistic production planning  requires proper planning of supply chain flow to counter unexpected situations such as  crippling and delays in delivering the product to the end-users. Such a case could lead to  congestion on the flow chain, leading to a longer lead time than any automotive industry  organisation tries to avoid the poor arrangement of the supply chain planning toward the  assembly line known as the production line. The implication of the problem requires  proper planning of supply chain flow to counter unexpected situations such as crippling  and delays in delivering the product to the customer. Such a case could lead to congestion  on the flow chain, leading to a longer lead time than any automotive industry organisation  tries to avoid. Therefore, the intention is to have a pleasant workplace environment and  secure from wasted waiting time. The QRM framework resolved the lead-time problem  in the supply chain at the production assembly line. This study investigates the effect of  the supply chain layout on the production output at the assembly line, analyses an  efficient production layout for the QRM supply chain based on simulation methods, and  validates the QRM supply chain framework through the Delphi method verification.  Thus, the QRM framework resolved the lead-time problem in the supply chain at the  production assembly line. The activities involved in the methodology include the problem  identification of supply chain activities, simulation analysis, QRM framework  establishment, and validation process. The study utilised the QRM tools and simulation  analysis during the investigation and later the improvement processes. Subsequently, the  implementation of new frameworks QRM at the production assembly line. The final  phase is the analysis of new frameworks and validation. To validate this new approach,  a Delphi method was used, and experts from the industry gave feedback on the study.  Finally, the QRM framework had significantly improved from the initial condition to the  latest recorded result. The net overall result of the lead time reduction was 62.2%, and  the assembly line production increased from 20 units per shift to 25 units per shift, a 25%  increase. The QRM framework had proven to be successful, highlighting the study&#x2019;s  novelty.</subfield>
  </datafield>
  <datafield tag="610" ind1="2" ind2="0">
    <subfield code="a">Faculty of Manufacturing and Mechatronic Engineering Technology</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Universities and colleges</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Theses</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="2">lcc</subfield>
    <subfield code="c">THESIS</subfield>
  </datafield>
</record>
