<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>03276ntm a2200337 i 4500</leader>
  <controlfield tag="003">MY-KuUP</controlfield>
  <controlfield tag="005">20260219143744.0</controlfield>
  <controlfield tag="006">t||||fr|||| 000 0 </controlfield>
  <controlfield tag="007">ta</controlfield>
  <controlfield tag="008">260219t20252025my a|||fr|||| 000 0 eng d</controlfield>
  <datafield tag="020" ind1=" " ind2=" ">
    <subfield code="a">THE0010348 (Local)</subfield>
    <subfield code="q">Hardback</subfield>
  </datafield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="a">UMPSA</subfield>
    <subfield code="b">eng</subfield>
    <subfield code="c">UMPSA</subfield>
    <subfield code="e">rda</subfield>
  </datafield>
  <datafield tag="090" ind1=" " ind2=" ">
    <subfield code="a">FIM .N39 2025 r Thesis</subfield>
  </datafield>
  <datafield tag="100" ind1="1" ind2=" ">
    <subfield code="a">Ahmad Nazif Bin Noor Kamar,</subfield>
    <subfield code="e">author.</subfield>
  </datafield>
  <datafield tag="245" ind1="1" ind2="0">
    <subfield code="a">Evaluating production process improvement strategies: utilizing discrete event simulation and system dynamics approaches in a manufacturing sme /</subfield>
    <subfield code="c">Ahmad Nazif Bin Noor Kamar</subfield>
  </datafield>
  <datafield tag="264" ind1=" " ind2="1">
    <subfield code="a">Kuantan, Pahang :</subfield>
    <subfield code="b">UMPSA,</subfield>
    <subfield code="c">2025</subfield>
  </datafield>
  <datafield tag="264" ind1=" " ind2="4">
    <subfield code="c">&#xA9; 2025</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">xii, 182 pages :</subfield>
    <subfield code="b">illustrations ;</subfield>
    <subfield code="c">30 cm. +</subfield>
    <subfield code="e">1 CD-ROM</subfield>
  </datafield>
  <datafield tag="336" ind1=" " ind2=" ">
    <subfield code="2">rdacontent</subfield>
    <subfield code="a">text</subfield>
  </datafield>
  <datafield tag="337" ind1=" " ind2=" ">
    <subfield code="2">rdamedia</subfield>
    <subfield code="a">unmediated</subfield>
  </datafield>
  <datafield tag="338" ind1=" " ind2=" ">
    <subfield code="2">rdacarrier</subfield>
    <subfield code="a">volume</subfield>
  </datafield>
  <datafield tag="347" ind1=" " ind2=" ">
    <subfield code="2">rda</subfield>
    <subfield code="a">text file</subfield>
    <subfield code="b">PDF</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">Faculty of Industrial Management</subfield>
  </datafield>
  <datafield tag="502" ind1=" " ind2=" ">
    <subfield code="a">Thesis (Doctor of Philosophy) -- Universiti Malaysia Pahang - 2025</subfield>
  </datafield>
  <datafield tag="504" ind1=" " ind2=" ">
    <subfield code="a">Includes bibliographical references</subfield>
  </datafield>
  <datafield tag="520" ind1="3" ind2=" ">
    <subfield code="a">Global manufacturing continues to evolve under the pressures of intensified competition, rapid technological advancement, and evolving customer expectations. While large firms have re-evaluated and transformed their operations using advanced technologies to improve production efficiency and maintain competitiveness, small and medium-sized enterprises (SMEs) often face difficulties due to constrained resources. The current work focuses on an SME specializing in aluminium casting products that struggle to meet monthly production targets. A hybrid simulation approach was adopted, combining discrete-event simulation (DES) and system dynamics (SD), to examine both operational inefficiencies and strategic capacity decisions. The DES model replicated the current production process and revealed that a 71% reduction in total production time was necessary to meet existing demand. While, the SD model assessed the long-term impacts of combining improvement strategies, which enabled the SME to potentially expand its capacity to 8,000 units per month. Combining DES and SD provided a comprehensive decision-support framework that addresses both short-term operational issues and long-term strategic planning. The novelty of this study lies in applying a sequential interaction mode of hybrid simulation within a real-world SME manufacturing context, where the output of one simulation model serves as the input for another. This approach allowed for a holistic evaluation of multiple improvement strategies across different decision levels, facilitating scenario-based planning and supporting data-driven decision-making with minimal investment. Future research could apply the proposed hybrid simulation approach across diverse industrial contexts to validate its generalizability and effectiveness. Such efforts would contribute to a broader empirical foundation and strengthen the body of knowledge concerning the scalability, adaptability, and practical application of hybrid simulation methods in implement process improvement.</subfield>
  </datafield>
  <datafield tag="610" ind1="2" ind2="0">
    <subfield code="a">Faculty of Industrial Management</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Universities and colleges</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Theses</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="2">lcc</subfield>
    <subfield code="c">THESIS</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">lcc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="5">1</subfield>
    <subfield code="7">0</subfield>
    <subfield code="a">10000</subfield>
    <subfield code="b">10000</subfield>
    <subfield code="d">2026-02-19</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">FIM .N39 2025 r Thesis</subfield>
    <subfield code="p">T000004102</subfield>
    <subfield code="r">2026-02-19 14:38:17</subfield>
    <subfield code="w">2026-02-19</subfield>
    <subfield code="y">RESTRICT</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">lcc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="5">1</subfield>
    <subfield code="7">6</subfield>
    <subfield code="a">10000</subfield>
    <subfield code="b">10000</subfield>
    <subfield code="d">2026-02-19</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">CD13963</subfield>
    <subfield code="p">T000004103</subfield>
    <subfield code="r">2026-02-19 14:38:50</subfield>
    <subfield code="w">2026-02-19</subfield>
    <subfield code="y">RESTRICT</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">104202</subfield>
    <subfield code="d">104208</subfield>
  </datafield>
</record>
