<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Design and fabricate a systematic dish rack drainer</title>
  </titleInfo>
  <titleInfo type="alternative">
    <title>Design and fabricate a systematic dish rack drainer</title>
  </titleInfo>
  <name type="personal">
    <namePart>Mohd Hafiz Mohd Nor</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">my</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Kuantan, Pahang</placeTerm>
    </place>
    <publisher>UMP</publisher>
    <dateIssued>2008</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <form authority="gmd">electronic resource</form>
    <extent>48 p. : ill. (some col.) ; 30 cm. + 1 computer disc</extent>
  </physicalDescription>
  <abstract>The idea to create and build a systematic dish rack drainer is come from   supervisor that gives me this title and task for this project. To design and fabricated this   cabinet, it must be compare with other product that maybe available in the market. First,   get an idea from internet, magazine, newspaper or other from available data. Form there   the information and idea to design and fabricated can be created.  Whole project involves various methods such as collecting data, concept design   and fabrication process. The whole project involved various method and process that   usually use in engineering such as concept design, analysis process and lastly fabrication   process.   This final year project takes one semester to complete. This project is individual   project and must be done within this semester. In this project, students must able apply   all knowledge during their studies in this Diploma of Mechanical Engineering course.   Overall from this project, time management and discipline is important to make sure this   project goes smooth as plan and done at correct time.</abstract>
  <targetAudience authority="marctarget">specialized</targetAudience>
  <note type="statement of responsibility">Mohd Hafiz Mohd Nor</note>
  <note>Project paper (Diploma of Machanical Engineering) -- Universiti Malaysia Pahang - 2008</note>
  <subject authority="lcsh">
    <topic>New products</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Production engineering</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Kitchen cabinets</topic>
  </subject>
  <identifier type="isbn">THE0007567(Local)</identifier>
  <recordInfo>
    <recordContentSource authority="marcorg">UMP</recordContentSource>
    <recordCreationDate encoding="marc">090713</recordCreationDate>
    <recordChangeDate encoding="iso8601">20251114204403.0</recordChangeDate>
    <recordIdentifier source="KUKTEM">vtls000040132</recordIdentifier>
  </recordInfo>
</mods>
