01940nam a2200193 a 4500001001400000003000700014005001700021008004100038020002200079040000800101100002200109245008200131246008000213260003400293300005800327502009100385520125200476650001801728vtls000040049KUKTEM20251114204403.0090710t2008 my a f 000 0 eng|d aTHE0006663(Local) aUMP0 aZaihin Mohd Zahib10aDevelopment of lift machine (using pulley and cable) /cZaihin Bin Mohd Zahib3 aDevelopment of lift machine (using pulley and cable)h[electronic resource] aKuantan, Pahang :bUMP,c2008 a49 p. :bill.(some col.) ;c30 cm. +e1 computer disc aProject paper (Diploma in Mechanical Engineering) -- Universiti Malaysia Pahang - 20083 aÙ8Ôdea to development of lift machine (using cable and pulley) is come from the FKM lecturer that gives a task and a title for this project. This project focuses in design, fabrication and analysis the mechanical part of machine and the system at the lift machine body. To achieve this project objective, this lift machine body structure and pulley system need to concern some other criteria such as strength, safety and ergonomic design. This project flow must start from design, analysis, and lastly fabrication process Before develop the lift machine (using cable and pulley), it must compare with other product (forklift) in market. It is because to study the customer need and to create a new design with new feature. Diploma Final Year Project will cover for the whole last semester, before go to the industrial training to complete this project. This is an individual task and must do by ourselves. This is also one of opportunity to student to show or to apply their knowledge also skill in using manufacturing process and mechanical design software in complete this project. Time management and a good planning also important to make sure the entire plan are in their way. Lastly, discipline needed to complete this project.  0aLifting-jacks