<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Design anf fabricate a new concept recycle bin for general purpose</title>
  </titleInfo>
  <titleInfo type="alternative">
    <title>Design anf fabricate a new concept recycle bin for general purpose</title>
  </titleInfo>
  <name type="personal">
    <namePart>Wan Muhammad Azwan Fazley Wan Ismail</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">my</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Kuantan, Pahang</placeTerm>
    </place>
    <publisher>UMP</publisher>
    <dateIssued>2008</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <form authority="gmd">electronic resource</form>
    <extent>50 p. : ill.(some col.) ; 30 cm. + 1 computer disc</extent>
  </physicalDescription>
  <abstract>This  project  is  about  designing  and  fabricating  the  recycle  bin  that  can  store   rubbish such as can, glass and paper. To design and  fabricated  this recycle bin,  it must   be  compare  with  other  product  that  available  in  the  market.  First,  get  an  idea  from   internet, magazine, newspaper or other from available data. Form  there  the  information   and idea to design and fabricated can be created. Whole project involves various methods such as collecting data, concept design and  fabrication  process. The whole  project  involved  various method  and  process  that usually use in engineering such as concept design, analysis process and lastly fabrication process. Overall from this project, time management and discipline is important to make sure this project goes smooth as plan and done at correct time.  </abstract>
  <targetAudience authority="marctarget">specialized</targetAudience>
  <note type="statement of responsibility">Wan Muhammad Azwan Fazley Bin  Wan Ismail</note>
  <note>Project paper (Diploma in Mechanical Engineering) -- Universiti Malaysia Pahang - 2008</note>
  <subject authority="lcsh">
    <topic>New products</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Containers</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Production engineering</topic>
  </subject>
  <identifier type="isbn">THE0007665(Local)</identifier>
  <recordInfo>
    <recordContentSource authority="marcorg">UMP</recordContentSource>
    <recordCreationDate encoding="marc">090710</recordCreationDate>
    <recordChangeDate encoding="iso8601">20251114204403.0</recordChangeDate>
    <recordIdentifier source="KUKTEM">vtls000040056</recordIdentifier>
  </recordInfo>
</mods>
