<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Development of apple peeler machine</title>
  </titleInfo>
  <titleInfo type="alternative">
    <title>Development of apple peeler machine</title>
  </titleInfo>
  <name type="personal">
    <namePart>Mohammad Afnan Mohammad Kamarizaman</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">my</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Kuantan, Pahang</placeTerm>
    </place>
    <publisher>UMP</publisher>
    <dateIssued>2008</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <form authority="gmd">electronic resource</form>
    <extent>64 p. : ill. (some col.) ; 30 cm. + 1 computer disc</extent>
  </physicalDescription>
  <abstract>The idea to create an apple peeler machine is come from supervisor that gives me this title and task for this project. To design and fabricated this apple peeler, it must be  compare with  other  product  that maybe  available  in  the market.  First,  get  an  idea from  internet,  magazine,  newspaper  or  other  from  available  data.  Form  there  the information and idea to design and fabricated can be created. Whole project involves various methods such as collecting data, concept design and  fabrication  process.  The whole  project involved  various method  and  process  that usually use in engineering such as concept design, analysis process and lastly fabrication process.  This final year project takes one semester to complete. This project is individual project and must be done within this semester. In this project, students must able apply all knowledge during  their  studies  in  this Diploma of Mechanical Engineering  course. Overall from this project, time management and discipline is important to make sure this project goes smooth as plan and done at correct time.</abstract>
  <targetAudience authority="marctarget">specialized</targetAudience>
  <note type="statement of responsibility">Mohammad Afnan Mohammad Kamarizaman</note>
  <note>Project paper (Diploma of Mechanical Engineering) -- Universiti Malaysia Pahang - 2008</note>
  <subject authority="lcsh">
    <topic>Kitchen utensils</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Production engineering</topic>
  </subject>
  <identifier type="isbn">THE0007539(Local)</identifier>
  <recordInfo>
    <recordContentSource authority="marcorg">UMP</recordContentSource>
    <recordCreationDate encoding="marc">090715</recordCreationDate>
    <recordChangeDate encoding="iso8601">20251114204405.0</recordChangeDate>
    <recordIdentifier source="KUKTEM">vtls000040363</recordIdentifier>
  </recordInfo>
</mods>
