<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>03040nam a2200253 a 4500</leader>
  <controlfield tag="001">vtls000040743</controlfield>
  <controlfield tag="003">KUKTEM</controlfield>
  <controlfield tag="005">20251114204415.0</controlfield>
  <controlfield tag="008">090723t2008    my a   f m    000 0 eng|d</controlfield>
  <datafield tag="020" ind1=" " ind2=" ">
    <subfield code="a">THE0007513(Local)</subfield>
  </datafield>
  <datafield tag="039" ind1=" " ind2="9">
    <subfield code="a">201905161446</subfield>
    <subfield code="b">fawwaz</subfield>
    <subfield code="c">201107132231</subfield>
    <subfield code="d">VLOAD</subfield>
    <subfield code="c">201011091807</subfield>
    <subfield code="d">ida</subfield>
    <subfield code="c">200908141651</subfield>
    <subfield code="d">VLOAD</subfield>
    <subfield code="y">200907231505</subfield>
    <subfield code="z">ida84</subfield>
  </datafield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="a">UMP</subfield>
  </datafield>
  <datafield tag="090" ind1=" " ind2=" ">
    <subfield code="a">TS156.2 .N35 2008 rs Bc.</subfield>
  </datafield>
  <datafield tag="100" ind1="0" ind2=" ">
    <subfield code="a">Mohd Najmi Mohamad</subfield>
  </datafield>
  <datafield tag="245" ind1="1" ind2="0">
    <subfield code="a">Body assembly process improvement for automotive industry /</subfield>
    <subfield code="c">Mohd Najmi Mohamad</subfield>
  </datafield>
  <datafield tag="246" ind1="3" ind2=" ">
    <subfield code="a">Body assembly process improvement for automotive industry</subfield>
    <subfield code="h">[electronic resource]</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="a">Kuantan, Pahang :</subfield>
    <subfield code="b">UMP,</subfield>
    <subfield code="c">2008</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">55 p. :</subfield>
    <subfield code="b">ill. ;</subfield>
    <subfield code="c">30 cm. +</subfield>
    <subfield code="e">1 computer disc</subfield>
  </datafield>
  <datafield tag="502" ind1=" " ind2=" ">
    <subfield code="a">Project paper (Bachelor of Mechanical Engineering with Automotive) -- Universiti Malaysia Pahang - 2008</subfield>
  </datafield>
  <datafield tag="520" ind1="3" ind2=" ">
    <subfield code="a">An  automotive  body  assembly  system  consists  of  many  individual  sub-assemblies and sheet metal parts welded. The objective  in  this project  is  to  identify  the problem  that  always  happens  in  line  assembly.  Then  improve  the  problem  in  line assembly  to  overcome  from  the  problem  arise. Hence make  a  comparison  and  find  a solution about body assembly  to  improve  the problem  from  the data analysis. At body assembly  process  there  are  several  problem  could  happen  such  as miss  the  spot  part, dent or hump, scratch, spatter burr and hole to the body during assembly. But the major problem happen at  line assembly  is  spot weld and men mistake. By using 4M method   which  includes machine, method, material and man, this problem can be identify easily and effected. As a result there are some problem that contributes to the problem happen such  as  logistic  problem which  involve  the wrong  part  delivery  and wrong  shipment. Besides that, man power and workability also be the problem to the line assembly. Lack of discipline, behaviour and competency of worker give a worse impact to the company. Wrong workability  involves many  of  tools, machine  and man  power  and  affected  the production  and  flow  in  line  assembly.  Spot  welding  becomes  a  problem  when  the current  voltage  supply  is  not enough and  it can work properly. Lastly  jigs  and  fixture need  to  be  right  servicing  schedule  to make  sure  the machine  and  tools  are  in  good   condition  and  avoid  the  problem  happen  used  it. The method were  used  to make  the analysis  data  is  by  making  study  case  at  AMM  factory  which  more  focus  at  body assembly  line and problem occur during  the process. From  the data collected, analysis data can be done and improve the problem that always happen in line assembly. Hence it gives  benefit  to  the  company  either  in  productivity  or working  environment  from  the solution has done.</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Assembly-line methods</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Automobile factories</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">1</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2019-09-04</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">TS156.2 .N35 2008 rs Bc.</subfield>
    <subfield code="p">0000038222</subfield>
    <subfield code="r">2019-09-04 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2019-09-04</subfield>
    <subfield code="y">PSM</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">1</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2019-09-04</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">CD 3464 | TS156.2 .N35 2008 rs Bc.</subfield>
    <subfield code="p">0000038223</subfield>
    <subfield code="r">2019-09-04 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2019-09-04</subfield>
    <subfield code="y">PSM</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="a">VIRTUA40</subfield>
    <subfield code="c">1503</subfield>
    <subfield code="d">1509</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="a">VTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5020*5200*6500*6501*9992</subfield>
  </datafield>
</record>