01773nam a2200205 a 4500001001400000003000700014005001700021008004100038020002200079040000800101100002900109245007800138260003700216300003800253502011300291520108000404650002501484650003301509650002501542vtls000029782KUKTEM20251114204418.0080627s2006 my f 001 0 eng|d aTHE0005003(Local) aUMP0 aAhmad Faris Mohd Ghazali10aWastage of materials at construction site /cAhmad Faris bin Mohd Ghazali aKuantan, Pahang :bKUKTEM,c2006 axiv, 92 p. :bcol. ill. ;c30 cm. aProject paper (Bachelor of Civil Engineering) -- Kolej Universiti Kejuruteraan dan Teknologi Malaysia - 20063 aIn construction industry, materials form a large part of the project cost and generally believed it will continue to rise in future because of unstable market and changing of technology. However, on many contracts material waste always results in reducing the profitability of parties that are involved as the cost become higher. Therefore a study was conducted to identify the causes of material wastage, methods of reducing and the range of waste for main materials used on site. The data is obtained using structured questionnaires, interviewing people who are involved in the project and based on some observations on site. An average index is used in the analyst the data for the purpose to get the results and conclusions. Based on this study, a few conclusions have been established. A few recommendation on how to minimized material wastage have also been suggested. The results including the main factors attribute to the waste, the recommendation for appropriate solutions to control and minimize the waste and the recent wastage rate for several materials. -Author 0aWaste disposal sites 0aWaste disposal in the ground 0aMaterials management