01874nam a2200193 a 4500001001400000003000700014005001700021008004100038020002200079040000800101100001800109245010700127260003400234300002600268502008700294520124300381650003001624650002601654vtls000029331KUKTEM20251114204438.0080609s2007 my f 001 0 eng|d aTHE0003484(Local) aUMP1 aLiew, Ahu Wen10aPlanning and scheduling for sport complex :ba case study of Indoor Stadium Terengganu /cLiew Ahu Wen aKuantan, Pahang :bUMP,c2007 axiv, 114 p. ;c30 cm. aProject paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 20073 aPlanning and scheduling is one of the processes in construction project. A proper planning and scheduling may produce a smooth work flow and ease the monitoring and controlling of project. In Malaysia construction industry, there are no standard guidelines to produce an accurate schedule. In addition, the techniques of the project management software are still new for the users due to lack of expose of the software especially P3. This research is focused on breaking down the work activities into detail level, the theory of time duration and determines the time duration in building construction. Work quantity and productivity of labors/ logistic are identified. Time duration for main structures of sport complex is estimated. From the analysis, the time duration for piling works is 63 days, lower ground floor is 201 days, ground floor is 485 days, first floor is 144 days, second floor is 239 days, third floor is 245 days, fourth floor is 241 days and roof system is 237 days. The overall time duration for this project is 739 days. This research may produce a guideline to the scheduler in estimating time duration for building construction and provide a platform for further study in advances the theory of scheduling.-Author 0aBuildingxSuperintendence 0aProduction scheduling