<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>02811nam a2200241 a 4500</leader>
  <controlfield tag="001">vtls000066271</controlfield>
  <controlfield tag="003">KUKTEM</controlfield>
  <controlfield tag="005">20251114204529.0</controlfield>
  <controlfield tag="008">121114t2012    my da  f m    10000  en dd</controlfield>
  <datafield tag="020" ind1=" " ind2=" ">
    <subfield code="a">THE0006855(Local)</subfield>
  </datafield>
  <datafield tag="039" ind1=" " ind2="9">
    <subfield code="a">201905291556</subfield>
    <subfield code="b">amirul</subfield>
    <subfield code="c">201301221041</subfield>
    <subfield code="d">huda</subfield>
    <subfield code="y">201211141612</subfield>
    <subfield code="z">huda</subfield>
  </datafield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="a">UMP</subfield>
  </datafield>
  <datafield tag="090" ind1=" " ind2=" ">
    <subfield code="a">TK5105.8885.S76 N23 2012 rs Bc.</subfield>
  </datafield>
  <datafield tag="100" ind1="0" ind2=" ">
    <subfield code="a">Nur Nadiah Mohammad Alwudin</subfield>
  </datafield>
  <datafield tag="245" ind1="1" ind2=" ">
    <subfield code="a">The reduction of work in progress between process in strut production line of a manufacturing factory /</subfield>
    <subfield code="c">Nur Nadiah Mohammad Alwudin</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="a">Kuantan, Pahang :</subfield>
    <subfield code="b">UMP,</subfield>
    <subfield code="c">2012</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">xiv, 52 p. :</subfield>
    <subfield code="b">ill. (some col.) ;</subfield>
    <subfield code="c">30 cm. +</subfield>
    <subfield code="e">1 CD ROM</subfield>
  </datafield>
  <datafield tag="502" ind1=" " ind2=" ">
    <subfield code="a">Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012</subfield>
  </datafield>
  <datafield tag="504" ind1=" " ind2=" ">
    <subfield code="a">Bibliography : p. 51-52</subfield>
  </datafield>
  <datafield tag="520" ind1=" " ind2=" ">
    <subfield code="a">In today&#x2019;s competitive business world, companies require small lead times, low costs and high customer service levels to survive. Because of this, companies have become more customers focused. The result is that companies have been putting in significant effort to reduce their lead times. The purpose of this thesis was to reduce work in progress (WIP)  between processes at ST (strut) production line in APM Shock Absorber Sdn Bhd. In order to achieve this, all processes that focus on three processes only which is ABW ABF, CO2 welding, and LET KHP. Some changes based on the Toyota Production System (TPS) were  implemented, The results were then shown in Yamazumi chart and then the implementation  were sustained in the standard operating procedure (SOP). APM Shock Absorber Sdn Bhd  has more than 32 years&#x2019; experience of producing absorber for automotive part. Due to  globalization and stiff competition, the reduction of WIP for each process is important so  that they have a smooth production line flow and could maintain their customer  satisfaction. It was found that the most appropriate method for lead time reduction was  doing the visualization of current cycle time on Yamazumi chart. Another observation that  was derived from the Yamazumi chart is the bottlenecks can be derived and waste at ST  line can be eliminated by having Kaizen activity such as reduce waiting time and position  the machine comfortably for the operator doing their process. Some other recommended  changes based on applying TPS are reduction of work in process inventory (WIP), reduction of waiting time, stop the process to build in quality, collect more information, and implementation of the 5S methodology. By implementing these changes, the future state  the of WIP can be reduce in between of the process and smooth production flow can occur.</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Struts frameworks</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">1</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2019-09-04</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">TK5105.8885.S76 N23 2012 rs Bc.</subfield>
    <subfield code="p">0000067410</subfield>
    <subfield code="r">2019-09-04 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2019-09-04</subfield>
    <subfield code="y">PSM</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">1</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2019-09-04</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">CD 6264 | TK5105.8885.S76 N23 2012 rs Bc.</subfield>
    <subfield code="p">0000067411</subfield>
    <subfield code="r">2019-09-04 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2019-09-04</subfield>
    <subfield code="y">PSM</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="a">VIRTUA40</subfield>
    <subfield code="c">3630</subfield>
    <subfield code="d">3636</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="a">VTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*9992</subfield>
  </datafield>
</record>
