00748nam a2200217 a 4500001001400000003000700014005001700021008004100038020002200079040000800101100001800109245015400127260003400281300003300315502008900348504002800437650002300465650000900488650002000497650001300517vtls000076411KUKTEM20251114204601.0131219t2012 my da f m 000 0 eng d aTHE0002920(Local) aUMP0 aPeter Meredan10aKuantan clay subgrade stabilization by using oil palm empty fruit brunches (OPEFB) ash mixed with Portland cement as stabilizer /cPeter anak Meredan aKuantan, Pahang :bUMP,c2012 axvi, 83 p. :bill. ;c30 cm. aProject paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang – 2012 aBibliography : p. 70-74 0aSoil stabilization 0aClay 0aPortland cement 0aOil palm