    <title>Analysis and countermeasure to improve production system performance by using overall equipment effectiveness at bi technologies sdn. Bhd</title>
  </titleInfo>
  <name type="personal">
    <namePart>Alicia, Beh</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <genre authority="marc">theses</genre>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">my</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Kuantan, Pahang</placeTerm>
    </place>
    <publisher>UMP</publisher>
    <dateIssued>2013</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>xii, 66 p. : ill. (some col.) ; 30 cm. + 1 CD-ROM</extent>
  </physicalDescription>
  <abstract>To compete in global market, no organization will tolerate losses. Overall Equipment  Effectiveness (OEE) is a novel technique to measure the effectiveness of a machine and it  truly reduces complex production problems into simple and intuitive presentation of  information. It considers all important measures of productivity. An attempt has been done  to measure and analyze existing Overall Equipment Effectiveness (OEE) at BI  Technologies Sdn. Bhd. in hope to reduce unplanned downtime losses on equipment  failure and tooling damage to maximize the productivity. Before obtaining the data to  calculate the existing OEE value, the product or process that have the most defects need to  be identified which is component HM72A-10 series at Moulded Inductor area. The  methods used to analyze these various causes were Ishikawa diagram, 5 Whys and 5W1H.  After knowing the causes of various activities that leads to high rates of defects, then  recommendations for improvements that could be used by BI Technologies were ready to  be made.   </abstract>
  <targetAudience authority="marctarget">specialized</targetAudience>
  <note type="statement of responsibility">Alicia Beh</note>
  <note>Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang – 2013  	</note>
  <note>Bibliography : p. 58-59</note>
  <subject authority="lcsh">
    <topic>Performance</topic>
    <topic>Measurement</topic>
  </subject>
  <identifier type="isbn">THE0005449(Local)</identifier>
  <recordInfo>
    <recordContentSource authority="marcorg">UMP</recordContentSource>
    <recordCreationDate encoding="marc">140506</recordCreationDate>
    <recordChangeDate encoding="iso8601">20251114204603.0</recordChangeDate>
    <recordIdentifier source="KUKTEM">vtls000077985</recordIdentifier>
  </recordInfo>
</mods>