02470nam a2200265 a 4500001001400000003000700014005001700021008004100038020002200079039004500101040000800146090002700154100003700181245014400218260003400362300005600396502009500452520125300547650002601800650002401826952012101850952013101971999002502102999007702127vtls000077969KUKTEM20251114204605.0140506t2013 my a f m 000 0 eng d aTHE0007487(Local) 9a201905161328bfawwazy201405061413zFida aUMP aTS155 .H53 2013 rs Bc.0 aNoor Hidayatul Adawiyah Shahizan10aProcess capability study in electronic industry- case study on aircoil lead frame welding (HM72B-06XXX) /cNoor Hidayatul Adawiyah Shahizan aKuantan, Pahang :bUMP,c2013 axv, 63 p. :bill. (some col.) ;c30 cm. +e1 CD-ROM aProject paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2013 aThe aim of this project is to implement the industrial engineering tools in selected manufacturing company to identify the process capability at the company production lines and to improve the quality of the product of company. The chosen company is B.I Technology Sdn. Bhd. and the product being analyzed is molded inductor. The capability data were obtained from B.I Technology and further analysis on the data was done manually and by using MINITAB software. The process of understanding the control and the capability (PUCC) is an iterative closed loop process for continuous improvement. It covers the DMAIC toolkit in the three phases. PUCC is an iterative approach that rotates between the three pillars of the process of understanding, process control, and process capability. The objective of the six sigma study of Molded Inductance is to achieve perfection molded manufacturing by reviewing the present robust manufacturing process, to find out way to improve and modify the process, which will yield molded inductance that are defect free and will give more customer satisfaction. The application of six sigma led to an improved process capability. At the end of this project the result is the Cpk had being improved from 0.84 to 1.75. 0aProduction management 0aProduction planning 00104071a20000b20000d2019-09-04l0oTS155 .H53 2013 rs Bc.p0000080297r2019-09-04 00:00:00t1w2019-09-04yPSM 00104071a20000b20000d2019-09-04l0oCD 7753 | TS155 .H53 2013 rs Bc.p0000080298r2019-09-04 00:00:00t1w2019-09-04yPSM aVIRTUA40c4664d4670 aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5200*6500*6501*9992