<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Design and fabrication of smoke piping system</title>
  </titleInfo>
  <name type="personal">
    <namePart>Ahmad Ikmal 'Akif Abdul Khalil</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <typeOfResource manuscript="yes">text</typeOfResource>
  <genre authority="marc">theses</genre>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">my</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Kuantan, Pahang</placeTerm>
    </place>
    <publisher>UMP</publisher>
    <dateIssued>2013</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>vi, 41 p. : ill. (some col.) ; 30 cm. + 1 CD-ROM</extent>
  </physicalDescription>
  <abstract>This report shows the design and fabrication of smoke piping system.The problem from the instrument is the smoke flow is late to fill the air smoke rig. It fills the rig with natural pressure come from smoke generator. It takes a long time to fill it.The objective of the report are to make the smoke go more faster to air flow bench and to control volume enter  the air flow bench using toggle switch.Design generation is showed and solid three dimensional structures modeling of the smoke piping system was developed with SolidWorks software. The result from testing the smoke piping system shows that the system able to suck smoke in short duration. Ideas for improvement for the smoke piping system also provided to further improve the smoke piping system.     </abstract>
  <targetAudience authority="marctarget">specialized</targetAudience>
  <note type="statement of responsibility">Ahmad Ikmal 'Akif Abdul Khalil</note>
  <note>Project paper (Diploma of Mechanical Engineering)-- Universiti Malaysia Pahang – 2013</note>
  <note>Bibliography : p. 35</note>
  <subject authority="lcsh">
    <topic>Piping</topic>
    <topic>System</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Piping</topic>
  </subject>
  <identifier type="isbn">THE0006446(Local)</identifier>
  <recordInfo>
    <recordContentSource authority="marcorg">UMP</recordContentSource>
    <recordCreationDate encoding="marc">140602</recordCreationDate>
    <recordChangeDate encoding="iso8601">20251114204615.0</recordChangeDate>
    <recordIdentifier source="KUKTEM">vtls000079290</recordIdentifier>
  </recordInfo>
</mods>
