01346ntm a2200205 a 4500001001400000003000700014005001700021008004100038020002200079040000800101100002000109245010000129260003400229300005700263502011400320504002800434520062600462650002601088650002601114vtls000083303KUKTEM20251117113236.0141111t2013 my a f m 000 0 eng d aTHE0004986(Local) aUMP1 aTeng, Lik Ching10aEvaluating the performance of the operation at the sawmill production company /cTeng Lik Ching aKuantan, Pahang :bUMP,c2013 axii, 83 p. :bill. (some col.) ;c30 cm. +e1 CD-ROM aProject paper (Bachelor of Industrial Technology Management with Honors) -- Universiti Malaysia Pahang - 2013 aBibliography : p. 64-673 aIn this study, it discusses about evaluating the performance of the operation at the sawmill production company. The scope of this study is focusing on the production process in sawmill company. The time frame covered is one year it is in the year of 2013. This study is conducted by using the ARENA simulation software to simulate the modeled process in the simulation software. It is a quantitative study in which the performance is measured by the productivity for the whole system of sawmill. The reducing of the waiting time in the bottleneck station able to provide an improvement in the sawmill production process. 0aProduction management 0aIndustrial management