<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Evaluating the performance of the operation at the sawmill production company</title>
  </titleInfo>
  <name type="personal">
    <namePart>Teng, Lik Ching</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <typeOfResource manuscript="yes">text</typeOfResource>
  <genre authority="marc">theses</genre>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">my</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Kuantan, Pahang</placeTerm>
    </place>
    <publisher>UMP</publisher>
    <dateIssued>2013</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>xii, 83 p. : ill. (some col.) ; 30 cm. + 1 CD-ROM</extent>
  </physicalDescription>
  <abstract>In this study, it discusses about evaluating the performance of the operation at the sawmill production company. The scope of this study is focusing on the production process in sawmill company. The time frame covered is one year it is in the year of 2013. This study is conducted by using the ARENA simulation software to simulate the modeled process in the simulation software. It is a quantitative study in which the performance is measured by the productivity for the whole system of sawmill. The reducing of the waiting time in the bottleneck station able to provide an improvement in the sawmill production process.</abstract>
  <targetAudience authority="marctarget">specialized</targetAudience>
  <note type="statement of responsibility">Teng Lik Ching</note>
  <note>Project paper (Bachelor of Industrial Technology Management with Honors) -- Universiti Malaysia Pahang - 2013</note>
  <note>Bibliography : p. 64-67</note>
  <subject authority="lcsh">
    <topic>Production management</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Industrial management</topic>
  </subject>
  <identifier type="isbn">THE0004986(Local)</identifier>
  <recordInfo>
    <recordContentSource authority="marcorg">UMP</recordContentSource>
    <recordCreationDate encoding="marc">141111</recordCreationDate>
    <recordChangeDate encoding="iso8601">20251117113236.0</recordChangeDate>
    <recordIdentifier source="KUKTEM">vtls000083303</recordIdentifier>
  </recordInfo>
</mods>
