<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>02443ntm a2200265 a 4500</leader>
  <controlfield tag="001">vtls000083312</controlfield>
  <controlfield tag="003">KUKTEM</controlfield>
  <controlfield tag="005">20251117113237.0</controlfield>
  <controlfield tag="008">141111t2014    my a   f m    000 0 eng d</controlfield>
  <datafield tag="020" ind1=" " ind2=" ">
    <subfield code="a">THE0001506(Local)</subfield>
  </datafield>
  <datafield tag="039" ind1=" " ind2="9">
    <subfield code="a">201905271020</subfield>
    <subfield code="b">asmadi</subfield>
    <subfield code="c">201712061052</subfield>
    <subfield code="d">huda</subfield>
    <subfield code="y">201411111110</subfield>
    <subfield code="z">Fida</subfield>
  </datafield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="a">UMP</subfield>
  </datafield>
  <datafield tag="090" ind1=" " ind2=" ">
    <subfield code="a">HD30.27 .T36 2014 r Bc.</subfield>
  </datafield>
  <datafield tag="100" ind1="1" ind2=" ">
    <subfield code="a">Tan, Yi Hua</subfield>
  </datafield>
  <datafield tag="245" ind1="1" ind2="2">
    <subfield code="a">A study of demand forecasting in electronic manufacturing industry using time-series approach /</subfield>
    <subfield code="c">Tan Yi Hua</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="a">Kuantan, Pahang :</subfield>
    <subfield code="b">UMP,</subfield>
    <subfield code="c">2014</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">xi, 74 p. :</subfield>
    <subfield code="b">ill. (some col.) ;</subfield>
    <subfield code="c">30 cm. +</subfield>
    <subfield code="e">1 CD-ROM</subfield>
  </datafield>
  <datafield tag="502" ind1=" " ind2=" ">
    <subfield code="a">Project paper (Bachelor of Industrial Technology Management with Honors) -- Universiti Malaysia Pahang - 2014</subfield>
  </datafield>
  <datafield tag="504" ind1=" " ind2=" ">
    <subfield code="a">Bibliography : p. 67-71</subfield>
  </datafield>
  <datafield tag="520" ind1="3" ind2=" ">
    <subfield code="a">The study of the evaluation on the forecasting techniques applied in the manufacturing industry is known as very crucial part in the operation decision making for all electronic manufacturing service industry. The objectives of this research are to evaluate the demand forecasting method used by the manufacturing company, analyses the sale data of the company using several forecasting method and lastly propose the most suitable forecasting method to the manufacturing company. The forecasting method used in the analysis involved Time Series Forecasting Method. The forecasting method was assess by using forecast error measurement tool such as Mean Absolute Deviation (MAD), Mean Squared Error (MSE), Mean Absolute Percentage Error (MAPE) and Tracking Signal. These forecast error analyses were used to monitor the forecast result of various methods. The result of this study showed that trend projection was chosen as the most suitable forecasting method as it produces the most accurate result and least forecast error. Demand forecasting plays a critical role in every business especially in manufacturing industry. Most of the operations decisions in  manufacturing industry are based on some kind of forecast for future demand. As a result, manufacturing company pay highly attention towards demand forecasting process and this study has devoted attention to this particular issue.</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Business forecasting</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Business planning</subfield>
  </datafield>
  <datafield tag="856" ind1="4" ind2="0">
    <subfield code="u">http://ecollib.ump.edu.my/18806/</subfield>
    <subfield code="z">Access in library only</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">1</subfield>
    <subfield code="a">10000</subfield>
    <subfield code="b">10000</subfield>
    <subfield code="d">2019-09-04</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">HD30.27 .T36 2014 r Bc.</subfield>
    <subfield code="p">0000090136</subfield>
    <subfield code="r">2019-09-04 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2019-09-04</subfield>
    <subfield code="y">PSM</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">1</subfield>
    <subfield code="a">10000</subfield>
    <subfield code="b">10000</subfield>
    <subfield code="d">2019-09-04</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">CD 8433 | HD30.27 .T36 2014 r Bc.</subfield>
    <subfield code="p">0000090137</subfield>
    <subfield code="r">2019-09-04 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2019-09-04</subfield>
    <subfield code="y">PSM</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="a">VIRTUA40</subfield>
    <subfield code="c">5333</subfield>
    <subfield code="d">5339</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="a">VTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*6501*8560*9992</subfield>
  </datafield>
</record>
