01553ntm a2200205 a 4500001001400000003000700014005001700021008004100038020002200079040000800101100001700109245009000126260003400216300005700250500003800307502012500345504002800470520083400498650001501332vtls000083214KUKTEM20251117113249.0141110t2013 my da f m 000 0 eng d aTHE0002361(Local) aUMP3 aLai, Saw Wai10aSimulating modelling for improving productivity of rice packaging mill /cLai Saw Wai aKuantan, Pahang :bUMP,c2013 axv, 79 p. :bill. (some col.) ;c30 cm. +e1 CD-ROM aFaculty of Engineering Technology aProject Paper (Bachelor Degree in Industrial Technology Management with Honours) -- Universiti Malaysia Pahang – 2013 aBibliography : p. 80-833 aIn this study, it discusses about bottlenecks occurs t the Rice Packaging Line by using the simulation to improve the productivity. The scope of this study is focusing on the packaging process in the Rice Packaging Line. The aim and objectives of this study is to identify bottlenecks and increase productivity in total. The time frame given to complete this project is one year starting from the year of 2012. This study is conducted by using the ARENA simulation software to simulate the modeled process in the simulation software. It is a quantitative study in which the performance is measured by the productivity for the whole system of production line. The altering of productivity and the resource utilization are able to provide an improvement of about 40percent in the current system which is 87 packs of rice per day. 0aSimulation