<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>A study on defect rate of packaging in manufacturing company</title>
  </titleInfo>
  <name type="personal">
    <namePart>Noor Hamidah Mohd Thahir</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <typeOfResource manuscript="yes">text</typeOfResource>
  <genre authority="marc">abstract or summary</genre>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">my</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Kuantan, Pahang</placeTerm>
    </place>
    <publisher>UMP</publisher>
    <dateIssued>2014</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>xii, 65 p. : ill. (some col.) ; 30 cm. + 1 CD-ROM</extent>
  </physicalDescription>
  <abstract>This research is a study on defect rate of packaging in manufacturing company. The aims of this research are to identify the factor that contributed in the packaging defect at a manufacturing company and to give the suggestion to solve the problem of packaging defect. This research is a case study and was performed at one of the manufacturing company that produces spices and conducts the process of packaging at Indera Mahkota, Kuantan, Pahang. Data are obtained from the observation, interview and data collection at the manufacturing company. The data and the interview feedback will be analyzed by using the Minitab software and used the method of Pareto diagram and Cause and Effect diagram. The result shows that the manpower is the major factor that contributed to the packaging defect to this company. The results from this study can help the company to know the root cause of the problem and to reduce the defect from the factor that has been found</abstract>
  <targetAudience authority="marctarget">specialized</targetAudience>
  <note type="statement of responsibility">Noor Hamidah Mohd Thahir</note>
  <note>Faculty of Industrial Management</note>
  <note>Project paper (Bachelor of Industrial Technology Management with Honours) -- Universiti Malaysia Pahang - 2014</note>
  <note>Bibliography : p. 55-59</note>
  <subject authority="lcsh">
    <topic>Process control</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Quality control</topic>
  </subject>
  <identifier type="isbn">THE0004989(Local)</identifier>
  <identifier type="uri">http://ecollib.ump.edu.my/18814/</identifier>
  <location>
    <url>http://ecollib.ump.edu.my/18814/</url>
  </location>
  <recordInfo>
    <recordContentSource authority="marcorg">UMP</recordContentSource>
    <recordCreationDate encoding="marc">150915</recordCreationDate>
    <recordChangeDate encoding="iso8601">20251117113301.0</recordChangeDate>
    <recordIdentifier source="KUKTEM">vtls000091233</recordIdentifier>
  </recordInfo>
</mods>
