01643ntm a2200229 a 4500001001400000003000700014005001700021008004100038020002200079040000800101100001800109245009400127260003400221300005700255500003700312502011500349504002800464520080700492650002601299650002801325856006001353vtls000091224KUKTEM20251117113312.0150914t2014 my da abm 000 0 eng d aTHE0005008(Local) aUMP1 aOng, Pei Shan12aA study of production line operation in electronic manufacturing industry /cOng Pei Shan aKuantan, Pahang :bUMP,c2014 axiv, 85 p. :bill. (some col.) ;c30 cm. +e1 CD-ROM aFaculty of Industrial Management aProject paper (Bachelor of Industrial Technology Management with Honours) -- Universiti Malaysia Pahang - 2014 aBibliography : p. 79-823 aIn this study, it discusses about evaluating and improving production system in electronic manufacturing industry by using simulation method. The scope of this study is focusing on the operation system of Functional Test jigs production line. The time frame covered is one year it is in the year of 2014. This study is conducted by using ARENA simulation software to simulate and model the production line. It is a quantitative study in which the performance is measured by the value added time, waiting time and productivity for the entire system of the Functional Test jigs production line. Results generated from the simulation show that adding a new holes drilling/milling workstation would produce significant effect in reducing overall value added times and wait times and improving productivity 0aAssembly-line methods 0aProduction-line methods40uhttp://ecollib.ump.edu.my/9656/zaccess in library only