<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>03186ntm a2200289 a 4500</leader>
  <controlfield tag="001">vtls000094289</controlfield>
  <controlfield tag="003">KUKTEM</controlfield>
  <controlfield tag="005">20251117113317.0</controlfield>
  <controlfield tag="008">160405t2015    my a   f      000 0 eng d</controlfield>
  <datafield tag="020" ind1=" " ind2=" ">
    <subfield code="a">THE0005355(Local)</subfield>
  </datafield>
  <datafield tag="039" ind1=" " ind2="9">
    <subfield code="a">201905151123</subfield>
    <subfield code="b">hanafiah</subfield>
    <subfield code="c">201711290933</subfield>
    <subfield code="d">fateeha</subfield>
    <subfield code="y">201604051531</subfield>
    <subfield code="z">huda</subfield>
  </datafield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="a">UMP</subfield>
  </datafield>
  <datafield tag="090" ind1=" " ind2=" ">
    <subfield code="a">FKP .H39 2015 r Bc.</subfield>
  </datafield>
  <datafield tag="100" ind1="0" ind2=" ">
    <subfield code="a">Hazimah Abdul Rahim</subfield>
  </datafield>
  <datafield tag="245" ind1="1" ind2=" ">
    <subfield code="a">Modelling and simulation of flexible production line for coil winding assembly /</subfield>
    <subfield code="c">Hazimah Abdul Rahim</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="a">Kuantan, Pahang :</subfield>
    <subfield code="b">UMP,</subfield>
    <subfield code="c">2015</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">xxiii, 88 p. :</subfield>
    <subfield code="b">ill. (some col.) ;</subfield>
    <subfield code="c">30 cm. +</subfield>
    <subfield code="e">1 CD-ROM</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">Faculty of Manufacturing Engineering</subfield>
  </datafield>
  <datafield tag="502" ind1=" " ind2=" ">
    <subfield code="a">Project Paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang &#x2013; 2015</subfield>
  </datafield>
  <datafield tag="504" ind1=" " ind2=" ">
    <subfield code="a">Bibliography: p. 84</subfield>
  </datafield>
  <datafield tag="520" ind1="3" ind2=" ">
    <subfield code="a">This  thesis  deals  with  modelling  and  simulation  of  flexible  production  line  for  coil winding assembly. Flexible production line is a production line capable  to change any changes  in  different  product  simultaneously  and  continuously.  The  reason  need  of developing  flexible  production  line  is  to  have  a  high  productivity,  good  quality  and low  cost  and  to  ensure  smoothness  of  the  production  line.  The  main  problem  at production  line  is  the  usage  of  the  conveyer  where  it  can  make  the  space  become crowded. The proposed method is by changing to cell manufacturing layout because it is way of lean manufacturing to guide company to implement  less waste as possible for  product  variety  to  the  customers.  The  objective  of  this  project  is  to  investigate current  performance  of  coil  winding  assembly  and  to  model  and  simulate  flexible production  line  using  Pro  Model  simulation  software.  In  this  case  study,  the framework of project will cover on research of cycle time, product mix, flexibility and efficient  usage  of  space.  A  company  has  been  selected  is  Vacuumschmelze(M)  Sdn Bhd and simulation ProModel 7.0 Software Student Version was used to complete the case.  The  project  is  begin  by  identifying  and  evaluating  the  problem  occur  at  the production line. The current condition of production line layout was  modelled  using simulation ProModel 7.0 Software Student Version. The simulation was run in 8 hours by following the working schedule at company. A total of 10 replication has been set for this project. From the result, the percentage show high utilization from the current performance. The percentage of operation is increase from 9.29% to 63.27%. From the result,  it  can  be  concluded  that  the  changing  of  the  new  layout  by  changing  the conveyer  to  the  U-shape  layout  was  the  most  significant  factor  in  productivity enhancement of the production.</subfield>
  </datafield>
  <datafield tag="610" ind1="2" ind2=" ">
    <subfield code="a">Faculty of Manufacturing Engineering</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Universities and Colleges</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Theses</subfield>
  </datafield>
  <datafield tag="856" ind1="4" ind2="0">
    <subfield code="u">http://ecollib.ump.edu.my/id/eprint/25975</subfield>
    <subfield code="z">Access in library only</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">1</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2019-09-04</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">FKP .H39 2015 r Bc.</subfield>
    <subfield code="p">0000108157</subfield>
    <subfield code="r">2019-09-04 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2019-09-04</subfield>
    <subfield code="y">PSM</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">1</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2019-09-04</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">CD 8339 | FKP .H39 2015 r Bc.</subfield>
    <subfield code="p">0000108158</subfield>
    <subfield code="r">2019-09-04 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2019-09-04</subfield>
    <subfield code="y">PSM</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="a">VIRTUA40</subfield>
    <subfield code="c">6528</subfield>
    <subfield code="d">6534</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="a">VTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6100*6500*6501*8560*9992</subfield>
  </datafield>
</record>
