<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>02634ntm a2200277 a 4500</leader>
  <controlfield tag="001">vtls000094313</controlfield>
  <controlfield tag="003">KUKTEM</controlfield>
  <controlfield tag="005">20251117113317.0</controlfield>
  <controlfield tag="008">160407t2015    my a   f      000 0 eng d</controlfield>
  <datafield tag="020" ind1=" " ind2=" ">
    <subfield code="a">THE0005294(Local)</subfield>
  </datafield>
  <datafield tag="039" ind1=" " ind2="9">
    <subfield code="a">201905151033</subfield>
    <subfield code="b">hanafiah</subfield>
    <subfield code="y">201604070945</subfield>
    <subfield code="z">huda</subfield>
  </datafield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="a">UMP</subfield>
  </datafield>
  <datafield tag="090" ind1=" " ind2=" ">
    <subfield code="a">FKP .A36 2015 r Bc.</subfield>
  </datafield>
  <datafield tag="100" ind1="0" ind2=" ">
    <subfield code="a">Aina Nadia Aida Mohd Latif</subfield>
  </datafield>
  <datafield tag="245" ind1="1" ind2=" ">
    <subfield code="a">Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine /</subfield>
    <subfield code="c">Aina Nadia Aida Mohd Latif</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="a">Kuantan, Pahang :</subfield>
    <subfield code="b">UMP,</subfield>
    <subfield code="c">2015</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">xiii, 77 p. :</subfield>
    <subfield code="b">ill. (some col.) ;</subfield>
    <subfield code="c">30 cm. +</subfield>
    <subfield code="e">1 CD-ROM</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">Faculty of Manufacturing Engineering</subfield>
  </datafield>
  <datafield tag="502" ind1=" " ind2=" ">
    <subfield code="a">Project Paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang &#x2013; 2015</subfield>
  </datafield>
  <datafield tag="504" ind1=" " ind2=" ">
    <subfield code="a">Bibliography: p. 49-51</subfield>
  </datafield>
  <datafield tag="520" ind1="3" ind2=" ">
    <subfield code="a">Most of manufacturers seek ways to reduce costs that associated with producing and distributing products. In order to reduce the cost, reduction of the losses is needed to improve the efficiency shop floor. High efficiency of machine needed to get higher p rofit in  the  global  competition.   A  smooth  production  operation  and  lower  downtime  in production shows  that the plant is in better management and maintenance. This research is proposed  to eliminate waste in setting up CNC winding machine using lean techniques and  subsequently  improve  the  availability  rate  of  OEE  by  reducing  set  up  time.  This research has conducted at BI Technologies Corporation production area which is at CNC winding area. By using overall equipment effectiveness as a tool,  it  is  used to evaluate how  effectively  a  manufacturing  operation  is  utilized.  The  element  of  OEE  which  is availability,  quality  and  performance.  By  propose  a  solution  to  company  which  is  toimprove  current  SOP  and  using  control  chart  to  investigate  the  OEE  data.  Ishikawadiagram also apply to show the root cause from investigation the chart from variation. At the end, the control chart used again to indicate the improvement at  CNC  winding area. The improvement of downtime will lower down the losses of company, and have higher availability with degree of utilization of the resources available.  This paper reports the results of this research, including the results of an industrial implementation.</subfield>
  </datafield>
  <datafield tag="610" ind1="2" ind2=" ">
    <subfield code="a">Faculty of Manufacturing Engineering</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Universities and Colleges</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Theses</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">1</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2019-09-04</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">FKP .A36 2015 r Bc.</subfield>
    <subfield code="p">0000108129</subfield>
    <subfield code="r">2019-09-04 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2019-09-04</subfield>
    <subfield code="y">PSM</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">lcc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">0</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2019-09-04</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">CD 8612 | FKP .A36 2015 r Bc.</subfield>
    <subfield code="p">0000108130</subfield>
    <subfield code="r">2019-09-04 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2019-09-04</subfield>
    <subfield code="y">PSM</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="a">VIRTUA40</subfield>
    <subfield code="c">6530</subfield>
    <subfield code="d">6536</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="a">VTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6100*6500*6501*9992</subfield>
  </datafield>
</record>
