<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine</title>
  </titleInfo>
  <name type="personal">
    <namePart>Aina Nadia Aida Mohd Latif</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <typeOfResource manuscript="yes">text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">my</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Kuantan, Pahang</placeTerm>
    </place>
    <publisher>UMP</publisher>
    <dateIssued>2015</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>xiii, 77 p. : ill. (some col.) ; 30 cm. + 1 CD-ROM</extent>
  </physicalDescription>
  <abstract>Most of manufacturers seek ways to reduce costs that associated with producing and distributing products. In order to reduce the cost, reduction of the losses is needed to improve the efficiency shop floor. High efficiency of machine needed to get higher p rofit in  the  global  competition.   A  smooth  production  operation  and  lower  downtime  in production shows  that the plant is in better management and maintenance. This research is proposed  to eliminate waste in setting up CNC winding machine using lean techniques and  subsequently  improve  the  availability  rate  of  OEE  by  reducing  set  up  time.  This research has conducted at BI Technologies Corporation production area which is at CNC winding area. By using overall equipment effectiveness as a tool,  it  is  used to evaluate how  effectively  a  manufacturing  operation  is  utilized.  The  element  of  OEE  which  is availability,  quality  and  performance.  By  propose  a  solution  to  company  which  is  toimprove  current  SOP  and  using  control  chart  to  investigate  the  OEE  data.  Ishikawadiagram also apply to show the root cause from investigation the chart from variation. At the end, the control chart used again to indicate the improvement at  CNC  winding area. The improvement of downtime will lower down the losses of company, and have higher availability with degree of utilization of the resources available.  This paper reports the results of this research, including the results of an industrial implementation.</abstract>
  <targetAudience authority="marctarget">specialized</targetAudience>
  <note type="statement of responsibility">Aina Nadia Aida Mohd Latif</note>
  <note>Faculty of Manufacturing Engineering</note>
  <note>Project Paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang – 2015</note>
  <note>Bibliography: p. 49-51</note>
  <subject>
    <name type="corporate">
      <namePart>Faculty of Manufacturing Engineering</namePart>
    </name>
    <topic>Dissertations</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Universities and Colleges</topic>
    <topic>Dissertations</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Theses</topic>
  </subject>
  <identifier type="isbn">THE0005294(Local)</identifier>
  <recordInfo>
    <recordContentSource authority="marcorg">UMP</recordContentSource>
    <recordCreationDate encoding="marc">160407</recordCreationDate>
    <recordChangeDate encoding="iso8601">20251117113317.0</recordChangeDate>
    <recordIdentifier source="KUKTEM">vtls000094313</recordIdentifier>
  </recordInfo>
</mods>
