<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <nonSort>A </nonSort>
    <title>study to identify the factor that causes project delay in construction at Terengganu</title>
  </titleInfo>
  <name type="personal">
    <namePart>Nurul Syakirah Binti Mohd Ali</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">my</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Kuantan, Pahang</placeTerm>
    </place>
    <publisher>UMP</publisher>
    <dateIssued>2016</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>x, 46 p. : ill. (some col.) ; 30 cm.+ 1 CD-ROM</extent>
  </physicalDescription>
  <abstract>This survey was conducted to find the factors causing time overrun (delay) from the contractor perspective. The objective of this study was to identify the factors and in order to rank the most influence factor. Sets of questionnaires were developed and data was collected by hand distributed and email. The scope of study focused on the construction project in Terengganu. The respondent of this study obtain from contractors registered under G7 with CIDB. The result of this study showed that the higher rate in delay come from external factor. External factor consist three subjects such as weather condition, natural disaster and unavoidable disaster.</abstract>
  <targetAudience authority="marctarget">specialized</targetAudience>
  <note type="statement of responsibility">Nurul Syakirah Binti Mohd Ali</note>
  <note>Faculty of Industrial Management</note>
  <note>Project Paper (Bachelor Degree in Project Management with Honors) -- Universiti Malaysia Pahang – 2016</note>
  <note>Bibliography</note>
  <subject>
    <name type="corporate">
      <namePart>Faculty of Industrial Management</namePart>
    </name>
    <topic>Dissertations</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Universities and Colleges</topic>
    <topic>Dissertations</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Theses</topic>
  </subject>
  <identifier type="isbn">THE0000095(Local)</identifier>
  <identifier type="uri">http://ecollib.ump.edu.my/id/eprint/4160</identifier>
  <location>
    <url>http://ecollib.ump.edu.my/id/eprint/4160</url>
  </location>
  <recordInfo>
    <recordContentSource authority="marcorg">UMP</recordContentSource>
    <recordCreationDate encoding="marc">161206</recordCreationDate>
    <recordChangeDate encoding="iso8601">20251117113328.0</recordChangeDate>
    <recordIdentifier source="KUKTEM">vtls000098283</recordIdentifier>
  </recordInfo>
</mods>
