<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Study on current practice of construction waste management system in Gambang, Kuantan, Pahang</title>
  </titleInfo>
  <name type="personal">
    <namePart>Nur Fatin Aqilah Mat Zin</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <typeOfResource manuscript="yes">text</typeOfResource>
  <genre authority="marc">abstract or summary</genre>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">my</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Kuantan, Pahang</placeTerm>
    </place>
    <publisher>UMP</publisher>
    <dateIssued>2016</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>xv, 48 p. : ill. (some col.) ; 30 cm. + 1 CD-ROM</extent>
  </physicalDescription>
  <abstract>Malaysian construction industry had shown a robust growth nowadays and it gives positive impact to the nation. Construction waste becomes a global issue facing by practitioners and researchers around the world. Waste can affects success of construction project significantly. Moreover, the increasing generation of construction wastes has caused significant impacts to the environment and aroused growing public concern in the local community. One of the objectives for this research is to characterize and quantify of construction waste generated in Gambang construction area. The standard procedure method was followed to conduct this research. Base on the research objective, the result shown that the generated steel waste ranged from 0.65% - 14.62%. For generated timber waste ranged 0.45% - 10.86%, the plastic waste ranged from 0.09% - 7.26%, the paper waste ranged from 0.15% - 2.24%, and others generated waste ranged from 0.18% - 47.68%. The result shown that there was lot of waste generated that was not managed properly in construction site. Therefore, the proper waste minimization is needed to control the quantity of construction waste produced.</abstract>
  <targetAudience authority="marctarget">specialized</targetAudience>
  <note type="statement of responsibility">Nur Fatin Aqilah Mat Zin</note>
  <note>Faculty of Civil Engineering and Earth Resources</note>
  <note>Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016</note>
  <note>Bibliography : p. 45-46</note>
  <subject authority="lcsh">
    <name type="corporate">
      <namePart>Faculty of Civil Engineering and Earth Resources</namePart>
    </name>
    <topic>Dissertations</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Universities and Colleges</topic>
    <topic>Dissertations</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Theses</topic>
  </subject>
  <identifier type="isbn">THE0000416(Local)</identifier>
  <identifier type="uri">http://ecollib.ump.edu.my/id/eprint/4056</identifier>
  <location>
    <url>http://ecollib.ump.edu.my/id/eprint/4056</url>
  </location>
  <recordInfo>
    <recordContentSource authority="marcorg">UMP</recordContentSource>
    <recordCreationDate encoding="marc">161129</recordCreationDate>
    <recordChangeDate encoding="iso8601">20251117113328.0</recordChangeDate>
    <recordIdentifier source="KUKTEM">vtls000098202</recordIdentifier>
  </recordInfo>
</mods>
