<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>02588nmm a2200313 a 4500</leader>
  <controlfield tag="001">vtls000098457</controlfield>
  <controlfield tag="003">KUKTEM</controlfield>
  <controlfield tag="005">20251117113332.0</controlfield>
  <controlfield tag="008">161214s2016    my     fq  d  001 0 eng d</controlfield>
  <datafield tag="020" ind1=" " ind2=" ">
    <subfield code="a">THE0005120(Local)</subfield>
  </datafield>
  <datafield tag="039" ind1=" " ind2="9">
    <subfield code="a">201905131521</subfield>
    <subfield code="b">hanafiah</subfield>
    <subfield code="c">201712081539</subfield>
    <subfield code="d">saini</subfield>
    <subfield code="y">201612141211</subfield>
    <subfield code="z">saini</subfield>
  </datafield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="a">UMP</subfield>
  </datafield>
  <datafield tag="090" ind1=" " ind2=" ">
    <subfield code="a">FKP .A84 2016 r Bc.</subfield>
  </datafield>
  <datafield tag="090" ind1=" " ind2=" ">
    <subfield code="a">CD 10451</subfield>
  </datafield>
  <datafield tag="100" ind1="0" ind2=" ">
    <subfield code="a">Wan Nurul Athia Wan Mohd Zamani</subfield>
  </datafield>
  <datafield tag="245" ind1="1" ind2="2">
    <subfield code="a">A study &amp; implementation of kaizen strategy for line production (cap cam shaft) in Sapura Machining</subfield>
    <subfield code="h">[electronic resource] /</subfield>
    <subfield code="c">Wan Nurul Athia Wan Mohd Zamani</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="a">Kuantan, Pahang :</subfield>
    <subfield code="b">UMP,</subfield>
    <subfield code="c">2016</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">1 computer disc :</subfield>
    <subfield code="b">digital data ;</subfield>
    <subfield code="c">12 cm.</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">Faculty of Manufacturing Engineering</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">Theses Gred A</subfield>
  </datafield>
  <datafield tag="502" ind1=" " ind2=" ">
    <subfield code="a">Project Paper (Bachelor of Engineering in Manufacturing Engineering (Hons.)) -- Universiti Malaysia Pahang &#x2013; 2016</subfield>
  </datafield>
  <datafield tag="520" ind1="3" ind2=" ">
    <subfield code="a">This thesis deal with Kaizen strategy which is implementation of 5S and purpose for standardized work. The project background is in Sapura Machining Corporation. The objective of this thesis is to implement the 5s method in line production Capcam Shaft and to purpose a standardized work for a better work sequence. The project method conducted is by doing the Gemba Walk and observed the OFI (Opportunity for Improvement). 5S had been implement based on the problem observe from the line production. The aim is to increase the cleanliness, safety for operator by using PPE (Personal Protective Equipment) and the training to discipline the operator. For standardized work, cycle time need to be record for before and after. The non-value added is reduce in the time taken to increase the line efficiency. Standardized work is made using simulation of Tecnomatix Software which is the plant need to be arrange like actual layout and insert the cycle time for each machine. For the result, 5S method that had been implement has been awarded as a &#x2018;Best Line 3S Finding Activity&#x2019; and &#x2018;5S best Practice&#x2019;. For standardized work the line efficiency increase from 70.23% to 95.43% and the transportation material time success to be reduce from 49.71% to 4.57%.</subfield>
  </datafield>
  <datafield tag="538" ind1=" " ind2=" ">
    <subfield code="a">Item in PDF format</subfield>
  </datafield>
  <datafield tag="610" ind1="2" ind2="0">
    <subfield code="a">Faculty of Manufacturing Engineering</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Universities and Colleges</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Theses</subfield>
  </datafield>
  <datafield tag="856" ind1="4" ind2="0">
    <subfield code="u">http://ecollib.ump.edu.my/id/eprint/4097</subfield>
    <subfield code="z">Access in library only</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">1</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2019-09-04</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">FKP .A84 2016 r Bc. | CD 10451</subfield>
    <subfield code="p">0000115966</subfield>
    <subfield code="r">2019-09-04 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2019-09-04</subfield>
    <subfield code="y">PSM</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="a">VIRTUA40</subfield>
    <subfield code="c">6940</subfield>
    <subfield code="d">6946</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="a">VTLSSORT0080*0200*0400*0900*0901*1000*2450*2600*3000*5000*5001*5020*5200*5380*6100*6500*6501*8560*9992</subfield>
  </datafield>
</record>