01654ntm a2200241 a 4500001001400000003000700014005001700021008004100038020002200079040000800101100002300109245010600132260003400238300005700272500003700329502010100366504002800467520074900495610005201244650004501296650001101341856006001352vtls000098326KUKTEM20251117113336.0161207t2015 my a f m 000 0 eng d aTHE0000038(Local) aUMP0 aNur Fatihah Zakeri14aThe causes and effect of delay to handover the project in construction industry /cNur Fatihah Zakeri aKuantan, Pahang :bUMP,c2015 axii, 70 p. :bill. (some col.) ;c30 cm. +e1 CD-ROM aFaculty of Industrial Management aProject paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2015 aBibliography : p. 49-513 aThis thesis is to identify the main cause of project delay and to know the effects that will be happen if the project was delay in construction industry at Kelantan. It is because construction industry is important to Malaysia and it is one of the catalysts to the economic growth in Malaysia. Other than that, this thesis also can help to improve the construction industry in Kelantan. This study also provides a lot of useful input and information to those involved in the construction industry both directly and indirectly. A survey was conducted to get the data and information about the causes and effects of project delay. The survey was conducted in construction industry at Kelantan. There are 73 respondents that involve in the survey.20aFaculty of Industrial ManagementxDissertations 0aUniversities and CollegesxDissertations 0aTheses40uhttp://ecollib.ump.edu.my/4188/zAccess in library only