01917ntm a2200229 a 4500001001400000003000700014005001700021008004100038020002200079040000800101100002100109245011600130260003400246300006600280500005300346502009000399504002800489520104600517610006801563650004501631650001101676vtls000102639KUKTEM20251117113352.0171227s2017 my da f am 000 0 eng d aTHE0000689(Local) aUMP0 aSharmaine Shaari10aTraffic management during construction :bcase study of flyover at Jalan Bukit Ubi, Kuantan /cSharmaine Shaari aKuantan, Pahang :bUMP,c2017 axiii, 79 p. :bill. (some col.), charts ;c30 cm. +e1 CD-ROM aFaculty of Civil Engineering and Earth Resources aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017 aBibliography : p. 59-613 aManaging traffic at the construction area is the crucial part without having risks to health and safety whether it is in short or long term duration. Traffic management includes all physical measures designed to affect the movement of traffic on an existing network including the volume of traffic and the type of vehicles used. This paper present the implementation of traffic management during the construction of flyover at Jalan Bukit Ubi, Kuantan, Pahang. This paper study on what have been applied during the construction of flyover by the contractors, engineers and other construction worker. Also, there will be some changes of lanes, traffic flow etc, due to the construction of flyover. Besides, there will be some traffic congestion during the construction Therefore, traffic counting is conducted during and after the construction of flyover, which both are compared in terms of traffic volume and types of vehicles used. The problems occurred during and after the construction of flyover will be discussed further on this study.20aFaculty of Civil Engineering and Earth ResourcesxDissertations 0aUniversities and CollegesxDissertations 0aTheses