<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Material takeoff for building information modeling (BIM) – Architectural component</title>
  </titleInfo>
  <name type="personal">
    <namePart>Muhammad Syaiful Ahdat Bin Muhamad Fetri</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">my</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Kuantan, Pahang</placeTerm>
    </place>
    <publisher>UMP</publisher>
    <dateIssued>2016</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>xiii, 62 p. : ill. ; 30 cm. + 1 CD-ROM</extent>
  </physicalDescription>
  <abstract>Today advance technology have impact to construction industries in Malaysia is going  from strength to strength, with a whole host of newly-announced project promising to  increase activity that showed the industries are rapidly growth year by year. To achieve the  good in quality of the construction it consist of three important component, first is scope of  work followed by the cost for the construction and lastly is time that needed to complete  the construction. The proper cost estimation, monitor and control are the key point of  success of construction. Nowadays estimator still rely on the 2D CAD drawing to perform  the material take off which lack of information that required by estimator. The uses of BIM  tools as a model based on estimation and materials takeoff are clear state in this research by  compared it with the manual method to perform the material take-off. This is because by  using manual approaches contributed to miscalculation problem. This research also can be  a sample to use Revit software to perform full material takeoff for architectural 3D model  for the lab building. Continue, the research are until providing the price for quantity survey  based on architect 3D model that model by using Revit software. The methodology for this  research is from modelling 3D architect for lab building until conduct cost estimation for  architecture component in the building. Overall in this study, researcher, performing  material takeoff and cost estimation by using BIM based on 3D architect model for  architect component only.</abstract>
  <targetAudience authority="marctarget">specialized</targetAudience>
  <note type="statement of responsibility">Muhammad Syaiful Ahdat Bin Muhamad Fetri</note>
  <note>Faculty of Civil Engineering and Earth Resources</note>
  <note>Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016</note>
  <note>Bibliography : p. 61-62</note>
  <subject authority="lcsh">
    <name type="corporate">
      <namePart>Faculty of Civil Engineering and Earth Resources</namePart>
    </name>
    <topic>Dissertations</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Universities and Colleges</topic>
    <topic>Dissertations</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Theses</topic>
  </subject>
  <identifier type="isbn">THE0007890(Local)</identifier>
  <identifier type="uri">http://ecollib.ump.edu.my/id/eprint/26022</identifier>
  <location>
    <url>http://ecollib.ump.edu.my/id/eprint/26022</url>
  </location>
  <recordInfo>
    <recordContentSource authority="marcorg">UMP</recordContentSource>
    <recordCreationDate encoding="marc">161124</recordCreationDate>
    <recordChangeDate encoding="iso8601">20251117113436.0</recordChangeDate>
    <recordIdentifier source="KUKTEM">vtls000098168</recordIdentifier>
  </recordInfo>
</mods>
