<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Process flow for electrical as-built building information modelling (BIM) model</title>
    <subTitle>a case study of podium for office building</subTitle>
  </titleInfo>
  <name type="personal">
    <namePart>Mohamad Nazren Izzudin Mohd Zainudin</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
    <role>
      <roleTerm type="text">author.</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">my</placeTerm>
    </place>
    <dateIssued encoding="marc">2019</dateIssued>
    <copyrightDate encoding="marc">2019</copyrightDate>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>x, 63 pages : Illustrations (some color) ; 30 cm. + 1 CD-ROM</extent>
  </physicalDescription>
  <abstract>Nowadays, the management of information throughout a building’s lifecycle is becoming increasingly important and building information modelling (BIM) is often to ensure the interoperability of data. In BIM, there is 5 major disciplines which are Architecture model, Structure model, Mechanical model, Electrical model and Plumbing model. For this research, the focusing is on data management and as built drawings for Electrical model. Basically, data management is important to present the information of the components existing in the building. It will expose to parties some related information that easily to be reviewed. By utilizing BIM, the correct information after post construction can be reviewed more efficient as parties are using the same software which is Autodesk Revit. Conventional method normally the parties only involved in 2D drawings, a lot of spread sheets regarding to the information of components in the building, but we transform to 3D with details information inserted that the parties easily to review. By using BIM model approach, researcher believe that it will help the construction industries and minimize miscommunication among parties in coming years.</abstract>
  <note type="statement of responsibility">Mohamad Nazren Izzudin Mohd Zainudin</note>
  <note>Faculty of Civil Engineering and Earth Resources</note>
  <note>Project Paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang – 2019</note>
  <note>Includes bibliographical references</note>
  <subject authority="lcsh">
    <name type="corporate">
      <namePart>Faculty of Civil Engineering &amp; Earth Resources</namePart>
    </name>
  </subject>
  <subject authority="lcsh">
    <topic>Dissertations</topic>
    <topic>Universities and colleges</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Theses</topic>
  </subject>
  <identifier type="isbn">THE0008198(Local)</identifier>
  <recordInfo>
    <recordContentSource authority="marcorg">UMP</recordContentSource>
    <recordCreationDate encoding="marc">191009</recordCreationDate>
    <recordChangeDate encoding="iso8601">20251125105359.0</recordChangeDate>
    <languageOfCataloging>
      <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
    </languageOfCataloging>
  </recordInfo>
</mods>
