<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>03727nam a2200349 i 4500</leader>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">lcc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="5">1</subfield>
    <subfield code="7">0</subfield>
    <subfield code="8">REF</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="c">REF</subfield>
    <subfield code="d">2022-01-12</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">KK .S53 2021 r Thesis</subfield>
    <subfield code="p">T000001674</subfield>
    <subfield code="r">2022-03-31 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2022-01-12</subfield>
    <subfield code="y">RESTRICT</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">lcc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="5">1</subfield>
    <subfield code="7">0</subfield>
    <subfield code="8">REF</subfield>
    <subfield code="a">20000</subfield>
    <subfield code="b">20000</subfield>
    <subfield code="d">2022-02-23</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">CD 13003</subfield>
    <subfield code="p">T000001675</subfield>
    <subfield code="r">2022-08-25 00:00:00</subfield>
    <subfield code="t">1</subfield>
    <subfield code="w">2022-02-23</subfield>
    <subfield code="y">RESTRICT</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">96300</subfield>
    <subfield code="d">96306</subfield>
  </datafield>
  <controlfield tag="003">MY-KuUP</controlfield>
  <controlfield tag="005">20251125105945.0</controlfield>
  <controlfield tag="006">a||||fr|||| 001 0 </controlfield>
  <controlfield tag="007">ta</controlfield>
  <controlfield tag="008">220223t20212021my a|||fram|| 001 0 eng d</controlfield>
  <datafield tag="020" ind1=" " ind2=" ">
    <subfield code="a">THE0009210(Local)</subfield>
  </datafield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="a">UMP</subfield>
    <subfield code="b">eng</subfield>
    <subfield code="c">UMP</subfield>
    <subfield code="e">rda</subfield>
  </datafield>
  <datafield tag="090" ind1=" " ind2=" ">
    <subfield code="a">KK .S53 2021 r Thesis</subfield>
  </datafield>
  <datafield tag="100" ind1="0" ind2=" ">
    <subfield code="a">Ahmad Shah Hizam Md Yasir,</subfield>
    <subfield code="e">author.</subfield>
  </datafield>
  <datafield tag="245" ind1="1" ind2="0">
    <subfield code="a">Development framework of assembly line simulation and optimization for special purpose vehicle /</subfield>
    <subfield code="c">Ahmad Shah Hizam Md Yasir</subfield>
  </datafield>
  <datafield tag="264" ind1=" " ind2="1">
    <subfield code="a">Kuantan, Pahang :</subfield>
    <subfield code="b">UMP,</subfield>
    <subfield code="c">2021</subfield>
  </datafield>
  <datafield tag="264" ind1=" " ind2="4">
    <subfield code="a">&#xA9; 2021</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">xxi, 213 pages :</subfield>
    <subfield code="b">illustrations (some color) ;</subfield>
    <subfield code="c">30 cm. +</subfield>
    <subfield code="e">1 CD ROM</subfield>
  </datafield>
  <datafield tag="336" ind1=" " ind2=" ">
    <subfield code="a">text</subfield>
    <subfield code="2">rdacontent</subfield>
  </datafield>
  <datafield tag="337" ind1=" " ind2=" ">
    <subfield code="a">unmediated</subfield>
    <subfield code="2">rdamedia</subfield>
  </datafield>
  <datafield tag="338" ind1=" " ind2=" ">
    <subfield code="a">volume</subfield>
    <subfield code="2">rdacarrier</subfield>
  </datafield>
  <datafield tag="347" ind1=" " ind2=" ">
    <subfield code="a">text file</subfield>
    <subfield code="b">PDF</subfield>
    <subfield code="2">rda</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">College of Engineering</subfield>
  </datafield>
  <datafield tag="502" ind1=" " ind2=" ">
    <subfield code="a">Thesis (Doctor of Philosophy) -- Universiti Malaysia Pahang &#x2013; 2021</subfield>
  </datafield>
  <datafield tag="504" ind1=" " ind2=" ">
    <subfield code="a">Includes bibliographical references</subfield>
  </datafield>
  <datafield tag="520" ind1="3" ind2=" ">
    <subfield code="a">Defence automotive vehicle, also known as a special purpose vehicle (SPV) is a highly fabricated type of vehicle. Many research have focused on commercial vehicle production system rather than the manufacturing of special purpose vehicle. Due to that, there is lesser specific study focused on optimised solution for special purpose vehicle manufacturing. This research focuses on the performance of an existing production line for Malaysia's defence automotive manufacturing industry. The main issues that arise from observation and data collections are; firstly, delivery is always behind schedule and secondly, the human factor that contributes to the increase of rejected parts and slowdown of the production line. As such, this research aims to develop a new framework which can optimise the production efficiency for the armoured vehicle assembly line. In the present work, this study has been executed into several stages. Firstly, performs correlated data gathering in an industrial premise and develops the simulation procedure. Secondly, analysis of current production layout by using WITNESS and workers working posture using DELMIA simulation have been done. The simulation data was verified by comparing it with the actual industrial data. Then, by using systematic layout planning (SLP), the alternatives layout was proposed. Next, assembly line balancing was performed using Kilbridge and Wester method to the chosen layout. By utilising evaluation of line balancing equations, results show that the proposed layout improved line balance efficiency from 35% to 99%, balance delay from 0.65 to 0.01, and smoothness index from 115.7 to 1.82. In the third stage, the chosen alternative layout was analysed using WITNESS simulation. The result shows the production output increasing between 23% to 75% in the range from 3 to 24-month production simulation. The workers working condition was measured using DELMIA simulation following which an improvement was made in actual working conditions. Rapid upper limb assessment (RULA) shows that the improved working postures are acceptable with a score between 1 and 2. The result was validated using Ovako working analysis system (OWAS). In the final stage, by utilising both simulation techniques, a framework was developed. The proposed framework was validated by 5 experts chosen from various automotive industries background. The suggested framework may empower in the growth of total output in a manufacturing system, especially in special purpose vehicle manufacturing.</subfield>
  </datafield>
  <datafield tag="610" ind1="2" ind2="0">
    <subfield code="a">College of Engineering</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Universities and colleges</subfield>
    <subfield code="x">Dissertations</subfield>
  </datafield>
  <datafield tag="650" ind1=" " ind2="0">
    <subfield code="a">Theses</subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="2">lcc</subfield>
    <subfield code="c">RESTRICT</subfield>
  </datafield>
</record>
