Factors that drive green building implementation and the cost impact of green building implementation / Muhamad Fadhil Abdul Halim

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2015Description: xiii, 112 p. : ill. (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0000033(Local)
Subject(s): Online resources: Dissertation note: Project Paper (Bachelor Degree (Hons) of Project Management) -- Universiti Malaysia Pahang – 2015 Abstract: This research is discuss about the factors that drive the green building implementation and the cost impact of green building implementation. The first objective of this research are to identify the factors that drive the contractors to implement green building practices in their project at the same time to analysed the cost impact when implementing green building practice in their project. Two type of data collecting technique are used in order to collect the data on the topic. The primary data are obtained through the survey of questionnaires that have been send to the total of 112 G7 contractors registered under CIDB located in Lembah Klang. Secondary data are collected through the website, reading the journal, articles and books in library. Based on the data analysis in chapter 4, in can be conclude that most of the respondent are agree that the issues of environmental problem including air pollution, global warming and carbon dioxide emission is the main factor that drive the contractors to implement green building practice. Meanwhile, the finding also shows that the green building practice will hugely give an impact on the lifecycle cost of the building such as reduce operation cost and utility cost. As the conclusion, in order to reduce the impact of built environment on people and environment, green building concept is the most applicable approaches.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG FIM .F33 2015 r Bc. (Browse shelf(Opens below)) 1 In Transit 0000115542
Final Year Report Final Year Report UMPLIB GAMBANG CD 10334 | FIM .F33 2015 r Bc. (Browse shelf(Opens below)) 1 In Transit 0000115543

Faculty of Industrial Management

Project Paper (Bachelor Degree (Hons) of Project Management) -- Universiti Malaysia Pahang – 2015

Bibliography : p. 104-106

This research is discuss about the factors that drive the green building implementation and the cost impact of green building implementation. The first objective of this research are to identify the factors that drive the contractors to implement green building practices in their project at the same time to analysed the cost impact when implementing green building practice in their project. Two type of data collecting technique are used in order to collect the data on the topic. The primary data are obtained through the survey of questionnaires that have been send to the total of 112 G7 contractors registered under CIDB located in Lembah Klang. Secondary data are collected through the website, reading the journal, articles and books in library. Based on the data analysis in chapter 4, in can be conclude that most of the respondent are agree that the issues of environmental problem including air pollution, global warming and carbon dioxide emission is the main factor that drive the contractors to implement green building practice. Meanwhile, the finding also shows that the green building practice will hugely give an impact on the lifecycle cost of the building such as reduce operation cost and utility cost. As the conclusion, in order to reduce the impact of built environment on people and environment, green building concept is the most applicable approaches.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us