000 03677ntm a2200337 i 4500
999 _c100887
_d100893
003 MY-KuUP
005 20251125110902.0
006 t||||fr|||| 000 0
007 ta
008 240604t20242024my a|||fr|||| 00| 0 eng d
020 _aTHE0009870 (Local)
_qHardback
040 _aUMPSA
_beng
_cUMP
_erda
090 _aFTKEE .D65 2024 r Thesis
100 0 _aDokala Janandra Krishna Kishore,
_eauthor.
245 1 0 _aA new teaching learning artificial bee colony based maximum power point tracking approach for assessing various parameters of phoovoltaic system under different atmospheric conditions /
_cDokala Janandra Krishna Kishore
264 _aKuantan, Pahang :
_bUMPSA,
_c2024
264 _c© 2024
300 _axiv, 148 pages ;
_billustration ;
_c30 cm. +
_e1 CD-ROM
336 _2rdacontent
_atext
337 _2rdamedia
_aunmediated
338 _2rdacarrier
_avolume
347 _2rda
_atext file
_bPDF
500 _aFaculty of Electrical & Electronics Engineering Technology
502 _aThesis (Doctor of Philosophy) -- Universiti Malaysia Pahang – 2024
504 _aIncludes bibliographical references
520 3 _aIn recent years, the greatest obstacle in the universe has been environmental contamination and shortage of energy due to the rapid utilization of conventional fossil fuels. It is evident that it has a serious impact on weather conditions, water resources, and people's livelihood. Hence, many countries are trying to implement renewable/sustainable energy sources to preserve the environment. For the electrical industry, renewable energy sources (RES‘s) perform a prominent role in fulfilling the energy shortage and satisfying consumers without any blackouts. However, the difficult task in the electrical system is to balance both power production and desired load demand without any voltage, current and frequency changes. Another difficulty in the electrical system with the integration of RES‘s is to minimize the entire cost, including initial cost, operational cost, replacement cost, and maintenance cost. Besides, the performance of the Renewable Energy (RE)-based system has to be enriched with regard to settling time, accuracy, speed, and efficiency. Hence, to optimize the cost of integrating RES‘s through newly developed maximum power point tracking (MPPT) based optimization method such as grasshopper optimization algorithm (GOA) has been introduced. The cost of integration of PV/WT/Battery is $408540. In addition, the Levelized Cost of Energy (LCE) factor is 0.502 at 210 kWh/day. Besides enhancing the RE-based performance in terms of settling time, accuracy, speed, and efficiency through hybrid gray wolf optimization with differential evolution (GWO-DE). As per simulation outcome the GWO-DE extracts maximum peak power (MPP) of 674.6W in 0.06 sec with 99.88% efficiency. In addition, to enhance the performance teaching learning-based artificial bee colony (TLABC) method has been used at distinct weather conditions. In order to ascertain the effectiveness of the proposed methods, the proposed methods have been compared with other studied methods. As per the simulation outcomes, the TLABC method shows a better response in terms of average tracking time, convergence speed of 0.5175 sec, 9 iterations, and efficiency of 99.99% under various atmospheric circumstances. Further, the proposed system has been developed in the PV laboratory and validated with simulation results.
610 2 0 _aFaculty of Electrical & Electronics Engineering Technology
_xDissertations
650 0 _aUniversities and colleges
_xDissertations
650 0 _aTheses
_xDissertations
942 _2lcc
_cTHESIS