| 000 | 01857nmm a2200277 a 4500 | ||
|---|---|---|---|
| 001 | vtls000031873 | ||
| 003 | KUKTEM | ||
| 005 | 20251117141023.0 | ||
| 008 | 081013t2007 xxu fs 001 0 eng d | ||
| 020 | _aMED0002424(Local) | ||
| 039 | 9 |
_a201906201335 _bamy2 _c201107132157 _dVLOAD _c200909021500 _diswan _c200909021139 _diswan _y200810131459 _zsaini |
|
| 040 | _aUMP | ||
| 090 | _advd TJ1367 .R54 2007 | ||
| 245 | 0 | 0 |
_aRigging operations _h[electronic resource] = Operaciones de aparejameiento |
| 246 | 3 | _aOperaciones de aparejameiento | |
| 260 |
_aVirginia Beach, VA : _bCoastal Technologies Corp. _c2007 |
||
| 300 |
_a1 DVD-ROM (26 min.) : _bsd., col. ; _c12cm. + _e1 guide (16p.); quiz sheet answers. |
||
| 500 | _aMenu options : play program, program outline, training points, resource material for DVD-Rom and language menu | ||
| 505 | 0 | _aIntroduction -- Rigging plan -- Load characteristics -- Equipment requirements -- Environmental factors -- Inspection requirements -- Inspecting wire rope -- Inspecting synthetic webbing -- Inspecting hardware attachments -- Inspecting assembled rigging -- Life preparation -- Lifting the load -- Lift safety -- Sling care and use -- Wire rope maintenance and storage -- Synthetic webbing maintenance -- Conclusioin -- Session summary | |
| 520 | _aExamines the rigging plan, the steps necessary to rig a load and execute a lift. Addresses the correct way to handle rigging equipment when a lift has been completed. Highlights safety issues in accordance with OSHA regulations. | ||
| 546 | _aIn English, dubbed in Spanish ; sub-titles in English | ||
| 650 | 0 |
_aHoisting machinery _xRigging |
|
| 650 | 0 | _aSafety education, Industrial | |
| 650 | 0 | _aCranes, dericks, etc. | |
| 999 |
_aVIRTUA40 _c10114 _d10120 |
||
| 999 | _aVTLSSORT0010*0030*0050*0080*0200*0390*0400*0900*2450*2460*2600*3000*5000*5050*5200*5460*6500*6501*6502*9990*9992 | ||