000 03604ntm a2200337 i 4500
999 _c102110
_d102116
003 MY-KuUP
005 20251125111015.0
006 t||||fr|||| 000 0
007 ta
008 250115t20242024my a|||fr|||| 000 0 eng d
020 _aTHE0009981 (Local)
_qHardback
040 _aUMPSA
_beng
_cUMPSA
_erda
090 _aFIM .R37 2024 r Thesis
100 0 _aWafa Rashid Salim Alalyani,
_eauthor.
245 1 0 _aDeveloping a Total Quality Management (TQM) relationship model:
_bthe mediating role of organizational citizenship behavior in enhancing project performance in construction projects /
_cWafa Rashid Salim Alalyani
264 1 _aKuantan, Pahang :
_bUMPSA,
_c2024
264 4 _c© 2024
300 _axii, 188 pages :
_billustration ;
_c30 cm. +
_e1 CD-ROM
336 _2rdacontent
_atext
337 _2rdamedia
_aunmediated
338 _2rdacarrier
_avolume
347 _2rda
_atext file
_bPDF
500 _aFaculty of Industrial Management
502 _aThesis (Doctor of Philosophy) -- Universiti Malaysia Pahang Al-Sultan Abdullah – 2024
504 _aIncludes bibliographical references
520 3 _aPast literature suggested that TQM factors are likely to enhance a firm’s performance. A significant volume of existing literature has checked the relationship among TQM factors and different dimensions of performance such as quality performance, business performance and marketing success in various sectors. Therefore, there is a scarcity of literature on the impact of TQM and institutional factors in construction projects performance with respect to Omani construction industry which is facing cost overrun due to delays. This research evaluated the implementation of TQM in Oman construction sector, with a sight to minimize the structural letdown of ongoing construction projects. To obtain this objective, this study empirically examined the relationships between Total Quality Management (TQM) factors—customer focus, continuous improvement, top management commitment, project strategy, and employee involvement—and institutional factors—normative pressure and coercive pressure—on construction project performance in Oman, moderated by project governance and mediated by Organizational Citizenship Behavior (OCB). This research used positivism research philosophy and quantitative research approach to carry out this research. The population of this research were 338 ongoing construction projects in Oman. Data were collected using a self-administered survey from 216 participants engaged in ongoing construction projects. The Partial Least Squares Structural Equation Modeling (PLS-SEM) technique was utilized for data analysis. The results indicated that customer focus, project strategy, and OCB significantly influenced construction project performance, whereas continuous improvement, top management commitment, and employee involvement did not have a significant impact. Additionally, OCB partially mediated the relationship between TQM factors and construction project performance, and project governance moderated the impact of TQM on project performance. These findings offer practical implications for enhancing project performance in the construction industry and contribute theoretically to the literature on TQM factors and Institutional factors by providing empirical evidence of their effectiveness in improving construction projects’ performance in Oman.
610 2 0 _aFaculty of Industrial Management
_xDissertations
650 0 _aUniversities and colleges
_v
_xDissertations
650 0 _aTheses
942 _2lcc
_cTHESIS