000 03371ntm a2200349 i 4500
003 MY-KuUP
005 20260806100037.0
006 t|||||r|||| 000 0
007 ta
008 260806t20252025my a|||fr|||| 000 0 eng d
020 _aTHE0010910 (Local)
_qHardback
040 _aUMPSA
_beng
_cUMPSA
_erda
090 _aFTKKP .K44 2025 r Bc.
100 0 _aKhertna A/P Prabagaran,
_eauthor.
245 1 0 _aOptimization of injector and producer well placement for waterflooding efficiency with economic analysis /
_cKhertna A/P Prabagaran
264 1 _aKuantan, Pahang :
_bUMPSA,
_c2025
264 4 _cยฉ 2025
300 _axi, 37 pages :
_billustrations ;
336 _2rdacontent
_atext
337 _2rdamedia
_aunmediated
338 _2rdacarrier
_avolume
347 _2rda
_atext file
_bPDF
500 _aFaculty of Chemical and Process Engineering Technology
502 _aFinal Year Report (Bachelor of Technology Mechanical Engineering (Petroleum) with Hons ) -- Universiti Malaysia Pahang Al-Sultan Abdullah - 2025
504 _aInclude bibliographical reference
520 3 _aWaterflooding, a secondary recovery method implemented after primary recovery depletion, relies on water injections to displace oil. This technique however faces difficult challenges like optimizing the placement of injection and production wells as inefficient well placement can impact the oil production and affecting the oil fieldโ€™s economic viability. The interplay between different well placement patterns affect fluid flow within the reservoir, impacting both the oil recovery rate and net present value of waterflood. This paper aims to study the effect of waterflooding by the optimization of injector and producer well placement in reservoir. The simulation process started by inputting the data of black oil model into the simulator. The three key parameters of this research were well placements (5-spot, 7-spot and direct vertical line), injection timing (year 2051), wettability condition (water-wet). The simulation will be run individually with each parameter as each case until the results reach an optimization. A comparison will be done based on the obtained results to identify the optimized parameter. From the simulated result, total oil production and net present value will be analysed. Direct Line pattern was the most optimized parameter where it gave highest value of total oil production (11.42 ๐‘š๐‘™๐‘› ๐‘ ๐‘š3). This was due to the direct lineโ€™s pattern arrangement, with more focused injection, it will control the waterflood front well. However, 5-spot pattern has the highest net present value (7.197%). The highest value of net present value indicates the favour in economic probability. 5-spot has the lowest total water injection, which lowers the operating costs, and it also has an excellent sweep efficiency. In conclusion, the results drawn a suggestion where direct line well pattern produces highest oil production which are the optimized parameters for oil recovery whereas 5-spot configuration likely to yield most favourable economic outcomes for waterflooding project.
610 2 0 _aFaculty of Chemical and Process Engineering Technology
_xDissertations
650 0 _aUniversities and colleges
_xDissertations
650 0 _aTheses
_xDissertations
856 _uhttps://umpir.ump.edu.my/id/eprint/48089
942 _2lcc
_cPSM
999 _c105406
_d105412