000 02143nam a2200253 a 4500
001 vtls000039948
003 KUKTEM
005 20251114204403.0
008 090709t2008 my a f 000 0 eng|d
020 _aTHE0007556(Local)
039 9 _a201905161556
_bfawwaz
_c201107132150
_dVLOAD
_c200908141645
_dVLOAD
_c200908141623
_dVLOAD
_y200907091132
_zida84
040 _aUMP
090 _aTS171.4 .E34 2008 rs Dip.
100 0 _aMohd Effi Mohjee
245 1 0 _aDesign and fabricate sieve machine /
_cMohd Effi B Mohjee
246 3 _aDesign and fabricate sieve machine
_h[electronic resource]
260 _aKuantan, Pahang :
_bUMP,
_c2008
300 _a58 p. :
_bill.(some col.) ;
_c30 cm. +
_e1 computer disc
502 _aProject paper (Diploma of Mechanical Engineering) -- Universiti Malaysia Pahang - 2008
520 3 _aIdea to develop of sieve machine is come from the supervisor that gives a task and a title for this project. This project focuses in design, fabrication of the mechanical part of machine and the system of the sieve machine. To achieve this project objective, this sieve machine body structure and mechanical system needs to concern some other criteria such as strength, safety and ergonomic design. This project flow must start from design, analysis, and lastly fabrication process Before develop the sieve machine, it must compare with other product in market. It is because to study the customer need and to create a new design with new feature. Diploma Final Year Project will cover for the whole last semester, before go to the industrial training to complete this project. This is an individual task and must do by ourselves. This is also one of opportunity to student to show or to apply their knowledge also skill in using manufacturing process and mechanical design software in complete this project. Time management and a good planning also important to make sure the entire plan are in their way. Lastly, discipline needed to complete this project.
650 0 _aProduction engineering
650 0 _aNew products
999 _aVIRTUA40
_c1161
_d1167
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5020*5200*6500*6501*9992