| 000 | 02238nam a2200253 a 4500 | ||
|---|---|---|---|
| 001 | vtls000039982 | ||
| 003 | KUKTEM | ||
| 005 | 20251114204404.0 | ||
| 008 | 090709t2008 my a f 000 0 eng|d | ||
| 020 | _aTHE0007572(Local) | ||
| 039 | 9 |
_a201905171104 _bfawwaz _c201905171102 _dfawwaz _c201108290903 _dFida _c201107132230 _dVLOAD _y200907091246 _zida84 |
|
| 040 | _aUMP | ||
| 090 | _aTS171.4 .H35 2008 rs Dip. | ||
| 100 | 0 | _aMohd Hairilbasyar Mohamad | |
| 245 | 1 | 0 |
_aDesign and development of the mechanical part of durian opener / _cMohd Hairilbasyar Bin Mohamad |
| 246 | 3 |
_aDesign and development of the mechanical part of durian opener _h[electronic resource] |
|
| 260 |
_aKuantan, Pahang : _bUMP, _c2008 |
||
| 300 |
_a49 p. : _bill. (some col.) ; _c30 cm. + _e1 computer disc |
||
| 502 | _aProject paper (Diploma of Mechanical Engineering) -- Universiti Malaysia Pahang - 2008 | ||
| 520 | 3 | _aIdea to development of durian opener is come from the FKM lecturer that gives a task and a title for this project. This project focuses in design, fabrication and analysis the mechanical part of machine and the system at the durian opener body. To achieve this project objective, this durian opener body structure and pulley system needs to concern some other criteria such as strength, safety and ergonomic design. This project flow must start from design, analysis, and lastly fabrication process. Before develop the durian opener, it must compare with other product in market. It is because to study the customer need and to create a new design with new feature. Diploma Final Year Project will cover for the whole last semester, before go to the industrial training to complete this project. This is an individual task and must do by ourselves. This is also one of opportunity to student to show or to apply their knowledge also skill in using manufacturing process and mechanical design software in complete this project. Time management and a good planning also important to make sure the entire plan are in their way. Lastly, discipline needed to complete this project. | |
| 650 | 0 | _aNew products | |
| 650 | 0 | _aProduction engineering | |
| 999 |
_aVIRTUA40 _c1187 _d1193 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5020*5200*6500*6501*9992 | ||