| 000 | 01613nam a2200253 a 4500 | ||
|---|---|---|---|
| 001 | vtls000040496 | ||
| 003 | KUKTEM | ||
| 005 | 20251114204406.0 | ||
| 008 | 090717t2008 my a f 000 0 eng|d | ||
| 020 | _aTHE0007623(Local) | ||
| 039 | 9 |
_a201905171153 _bfawwaz _c201107132154 _dVLOAD _c200908141649 _dVLOAD _c200908141629 _dVLOAD _y200907171015 _zida84 |
|
| 040 | _aUMP | ||
| 090 | _aTS171.4 .Z34 2008 rs Dip. | ||
| 100 | 0 | _aMohd Zaeed Mohd Zin | |
| 245 | 1 | 0 |
_aDesign and fabricate measuring starting block / _cMohd Zaeed Bin Mohd Zin |
| 246 | 3 |
_aDesign and fabricate measuring starting block _h[electronic resource] |
|
| 260 |
_aKuantan, Pahang : _bUMP, _c2008 |
||
| 300 |
_a53 p. : _bill. (some col.) ; _c30 cm. + _e1 computer disc |
||
| 502 | _aProject paper (Diploma of Mechanical Engineering) -- Universiti Malaysia Pahang - 2008 | ||
| 520 | 3 | _aDesign and fabrication for measuring starting block for sprinter use many stell such as palte bar,u bar and etc.process to fabricate this product start from litereture review from market for easy to design this product. Concept important because smooth planning to fabricate this product.advantages and disadvantages from literature review use to make concept for this project.many process invold to make this product such as drilling, cutting and etc. measuring starting block import to sprinter and coach analysis their starting point. | |
| 650 | 0 | _aBlock designs | |
| 650 | 0 | _aProduction engineering | |
| 999 |
_aVIRTUA40 _c1248 _d1254 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5020*5200*6500*6501*9992 | ||