| 000 | 02231nam a2200265 a 4500 | ||
|---|---|---|---|
| 001 | vtls000040311 | ||
| 003 | KUKTEM | ||
| 005 | 20251114204406.0 | ||
| 008 | 090714t2008 my a f m 000 0 eng d | ||
| 020 | _aTHE0007560(Local) | ||
| 039 | 9 |
_a201905161600 _bfawwaz _c201107132153 _dVLOAD _c201103251358 _dFida _c200908141648 _dVLOAD _y200907141546 _zkam |
|
| 040 | _aUMP | ||
| 090 | _aTS171.4 .F35 2008 rs Dip | ||
| 100 | 0 | _aMuhammad Fakhrul Hashim | |
| 245 | 1 | 0 |
_aDevelopment of foldable and portable goalpost for street soccer / _cMuhammad Fakhrul Bin Hashim |
| 246 | 3 |
_aDevelopment of foldable and portable goalpost for street soccer _h[electronic resource] |
|
| 260 |
_aKuantan, Pahang : _bUMP, _c2008 |
||
| 300 |
_a39 p. : _bill. (some col.) ; _c30 cm. + _e1 computer disc |
||
| 502 | _aProject paper (Diploma of Mechanical Engineering) -- Universiti Malaysia Pahang - 2008 | ||
| 520 | 3 | _aThe idea to create and build a portable and foldable goalpost for street soccer is come from supervisor that gives me this title and task for this project. To design and fabricated this goalpost, it must be compare with other product that maybe available in the market. First, get an idea from internet, magazine, newspaper or other from available data. Form there the information and idea to design and fabricated can be created. Whole project involves various methods such as collecting data, concept design and fabrication process. The whole project involved various method and process that usually use in engineering such as concept design, analysis process and lastly fabrication process. This final year project takes one semester to complete. This project is individual project and must be done within this semester. In this project, students must able apply all knowledge during their studies in this Diploma of Mechanical Engineering course. Overall from this project, time management and discipline is important to make sure this project goes smooth as plan and done at correct time. | |
| 650 | 0 |
_aSoccer goalposts _xDesign and construction |
|
| 650 | 0 |
_aSoccer _xEquipment and supplies |
|
| 650 | 0 | _aProduction engineering | |
| 999 |
_aVIRTUA40 _c1253 _d1259 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5020*5200*6500*6501*6502*9992 | ||