| 000 | 02262nam a2200241 a 4500 | ||
|---|---|---|---|
| 001 | vtls000041094 | ||
| 003 | KUKTEM | ||
| 005 | 20251114204408.0 | ||
| 008 | 090805t2008 my a f m 000 0 eng|d | ||
| 020 | _aTHE0007653(Local) | ||
| 039 | 9 |
_a201905171210 _bfawwaz _c201107132159 _dVLOAD _c200908141653 _dVLOAD _c200908141636 _dVLOAD _y200908051206 _zida84 |
|
| 040 | _aUMP | ||
| 090 | _aTS178.5 .H39 2008 rs Bc. | ||
| 100 | 0 | _aHazmil Hapaz | |
| 245 | 1 | 0 |
_aProductivity improvement through line balancing / _cHazmil Hapaz |
| 246 | 3 |
_aProductivity improvement through line balancing _h[electronic resource] |
|
| 260 |
_aKuantan, Pahang : _bUMP, _c2008 |
||
| 300 |
_a53 p. : _bill. (some col.) ; _c30 cm. + _e1 computer disc |
||
| 502 | _aProject paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2008 | ||
| 520 | 3 | _aPoor layout design is determine as a major problem contribution in small and medium industry. These particular problems thus affect the productivity and the line efficiency as well. Throughout the study, the aim is to proposed new layout to the related company to increase their productivity. The major step is to identify a bottleneck workstation in current layout. After identify related problems, the current layout is redesign by computing the standard time and processing time in each workstations. In each workstation the processing time is different and the longest time consumption is workstation will be identified as a bottleneck workstation. This related line is studied by time study techniques. The time is taken by stopwatch. In this study, application of Computer Aided tools is introduced which in this study is WITNESS SOFTWARE. The related inputs are going to be simulated with this software. The manual calculation also included especially in line balancing algorithm. The goal of the thesis is to seek the best layout in terms of line efficiency and productivity rate hence proposed to the company. Through out the study, 3 layouts have been achieved. Among 3 layouts only one will be propose to the company. This layout has better line efficiency and rate of productivity. | |
| 650 | 0 | _aAssembly-line balancing | |
| 999 |
_aVIRTUA40 _c1315 _d1321 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5020*5200*6500*9992 | ||